Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects
S Aminbakhsh, M Gunduz, R Sonmez
Journal of safety research 46, 99-105, 2013
5082013
Construction labor productivity modeling with neural networks
R Sonmez, JE Rowings
Journal of construction engineering and management 124 (6), 498-504, 1998
2541998
Conceptual cost estimation of building projects with regression analysis and neural networks
R Sonmez
Canadian Journal of Civil Engineering 31 (4), 677-683, 2004
2002004
A smart contract system for security of payment of construction contracts
S Ahmadisheykhsarmast, R Sonmez
Automation in construction 120, 103401, 2020
1932020
A hybrid genetic algorithm for the discrete time–cost trade-off problem
R Sonmez, ÖH Bettemir
Expert Systems with Applications 39 (13), 11428-11434, 2012
1602012
Parametric range estimating of building costs using regression models and bootstrap
R Sonmez
Journal of construction Engineering and Management 134 (12), 1011-1016, 2008
1142008
Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem
S Aminbakhsh, R Sonmez
Expert Systems with Applications 51, 177-185, 2016
1092016
Quantiative methodology for determination of cost contingency in international projects
R Sonmez, A Ergin, MT Birgonul
Journal of Management in Engineering 23 (1), 35-39, 2007
1042007
Range estimation of construction costs using neural networks with bootstrap prediction intervals
R Sonmez
Expert systems with applications 38 (8), 9913-9917, 2011
842011
Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling
ÖH Bettemir, R Sonmez
Journal of Management in Engineering 31 (5), 04014082, 2015
792015
Predesign cost estimation of urban railway projects with parametric modeling
R Sonmez, B Ontepeli
Journal of Civil Engineering and management 15 (4), 405-409, 2009
652009
Backward-forward hybrid genetic algorithm for resource-constrained multiproject scheduling problem
R Sonmez, F Uysal
Journal of Computing in Civil Engineering 29 (5), 04014072, 2015
492015
Pareto front particle swarm optimizer for discrete time-cost trade-off problem
S Aminbakhsh, R Sonmez
Journal of Computing in Civil Engineering 31 (1), 04016040, 2017
482017
BIM integrated smart contract for construction project progress payment administration
R Sonmez, S Ahmadisheykhsarmast, AA Güngör
Automation in Construction 139, 104294, 2022
452022
A support vector machine method for bid/no bid decision making
R Sonmez, B Sözgen
Journal of Civil Engineering and Management 23 (5), 641-649, 2017
402017
Blockchain in project management: a systematic review of use cases and a design decision framework
R Sonmez, FÖ Sönmez, S Ahmadisheykhsarmast
Journal of Ambient Intelligence and Humanized Computing, 1-15, 2023
232023
Hybrid optimization method for large-scale multimode resource-constrained project scheduling problem
R Sonmez, M Gürel
Journal of Management in Engineering 32 (6), 04016020, 2016
222016
Review of conceptual cost modeling techniques
R Sonmez
AACE International Transactions, ES71, 2005
212005
Impact of occasional overtime on construction labor productivity: quantitative analysis
R Sonmez
Canadian Journal of Civil Engineering 34 (7), 803-808, 2007
202007
Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem
R Sonmez, S Aminbakhsh, T Atan
Journal of Construction Engineering and Management 146 (8), 04020084, 2020
182020