Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects S Aminbakhsh, M Gunduz, R Sonmez Journal of safety research 46, 99-105, 2013 | 407 | 2013 |
Construction labor productivity modeling with neural networks R Sonmez, JE Rowings Journal of construction engineering and management 124 (6), 498-504, 1998 | 230 | 1998 |
Conceptual cost estimation of building projects with regression analysis and neural networks R Sonmez Canadian Journal of Civil Engineering 31 (4), 677-683, 2004 | 176 | 2004 |
A hybrid genetic algorithm for the discrete time–cost trade-off problem R Sonmez, ÖH Bettemir Expert Systems with Applications 39 (13), 11428-11434, 2012 | 135 | 2012 |
Parametric range estimating of building costs using regression models and bootstrap R Sonmez Journal of construction Engineering and Management 134 (12), 1011-1016, 2008 | 101 | 2008 |
Quantiative methodology for determination of cost contingency in international projects R Sonmez, A Ergin, MT Birgonul Journal of Management in Engineering 23 (1), 35-39, 2007 | 94 | 2007 |
Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem S Aminbakhsh, R Sonmez Expert Systems with Applications 51, 177-185, 2016 | 76 | 2016 |
Range estimation of construction costs using neural networks with bootstrap prediction intervals R Sonmez Expert systems with applications 38 (8), 9913-9917, 2011 | 72 | 2011 |
Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling ÖH Bettemir, R Sonmez Journal of Management in Engineering 31 (5), 04014082, 2015 | 58 | 2015 |
Predesign cost estimation of urban railway projects with parametric modeling R Sonmez, B Ontepeli Journal of Civil Engineering and management 15 (4), 405-409, 2009 | 55 | 2009 |
A smart contract system for security of payment of construction contracts S Ahmadisheykhsarmast, R Sonmez Automation in construction 120, 103401, 2020 | 46 | 2020 |
Backward-forward hybrid genetic algorithm for resource-constrained multiproject scheduling problem R Sonmez, F Uysal Journal of Computing in Civil Engineering 29 (5), 04014072, 2015 | 42 | 2015 |
Smart contracts in construction industry S Ahmadisheykhsarmast, R Sonmez 5th International Project & Construction Management Conference, 767-774, 2018 | 24 | 2018 |
A support vector machine method for bid/no bid decision making R Sonmez, B Sözgen Journal of Civil Engineering and Management 23 (5), 641-649, 2017 | 24 | 2017 |
Pareto front particle swarm optimizer for discrete time-cost trade-off problem S Aminbakhsh, R Sonmez Journal of Computing in Civil Engineering 31 (1), 04016040, 2017 | 22 | 2017 |
Construction labor productivity modeling with neural networks and regression analysis R Sonmez Iowa State University, 1996 | 21 | 1996 |
Review of conceptual cost modeling techniques R Sonmez AACE International Transactions, ES71, 2005 | 19 | 2005 |
Hybrid optimization method for large-scale multimode resource-constrained project scheduling problem R Sonmez, M Gürel Journal of Management in Engineering 32 (6), 04016020, 2016 | 17 | 2016 |
Critical sequence crashing heuristic for resource-constrained discrete time–cost trade-off problem R Sonmez, MA Iranagh, F Uysal Journal of construction engineering and management 142 (3), 04015090, 2016 | 14 | 2016 |
Impact of occasional overtime on construction labor productivity: quantitative analysis R Sonmez Canadian Journal of Civil Engineering 34 (7), 803-808, 2007 | 14 | 2007 |