Selamet Ercelebi
Selamet Ercelebi
Verified email at itu.edu.tr
Title
Cited by
Cited by
Year
Optimization of shovel-truck system for surface mining
SG Ercelebi, A Bascetin
Journal of the Southern African Institute of Mining and Metallurgy 109 (7 …, 2009
1782009
Surface settlement predictions for Istanbul Metro tunnels excavated by EPB-TBM
SG Ercelebi, H Copur, I Ocak
Environmental Earth Sciences 62 (2), 357-365, 2011
892011
Operational and geological parameters in the assessing blast induced airblast-overpressure in quarries
C Kuzu, A Fisne, SG Ercelebi
Applied Acoustics 70 (3), 404-411, 2009
572009
Extreme value analysis of Istanbul air pollution data
SG Ercelebi, H Toros
CLEAN–Soil, Air, Water 37 (2), 122-131, 2009
412009
An expert system for hydraulic excavator and truck selection in surface mining
C Kirmanli, SG Ercelebi
Journal of the Southern African Institute of Mining and Metallurgy 109 (12 …, 2009
342009
Surface settlement prediction for Istanbul metro tunnels via 3D FE and empirical methods
SG Ercelebi, H Copur, N Bilgin, C Feridunoglu
Tunnelling and Underground Space Technology, London, England, 163-169, 2005
182005
Review of surface mining equipment selection techniques
SG Ercelebi, C Kirmanli
Mine planning and equipment selection 2000, 547-553, 2018
152018
Türkiye Yer altı Sıcaklık Gradyanı Dağılımının Derin Kuyu Sıcaklıkları ve Variogram Analizi Kullanılarak Haritalanması
M MIHÇAKAN, M Onur, SG Erçelebi, A Okay, M YILMAZER
Tübitak Projesi No: YDABÇAG-100Y040, Kasım, 2006
102006
Map of subsurface temperature gradient distribution of Turkey using deep well temperatures and variogram analysis
M Mihcakan, M Onur, SG Ercelebi, A Okay, M Yilmazer
TUBİTAK, Report No: YDABCAG-100Y040, 2006
62006
Performance analysis of mining machinery used in KBI Murgul Mines and Optimum replacement times
SG Erçelebi, H Ergin, M Yilmaz
16th Mining Congress of Turkey, 65-70, 1999
51999
Reliability and availability analysis of mining systems
SG Ercelebi, TM Yegulalp
Transactions of the Institution of Mining and Metallurgy. Section A. Mining …, 1993
41993
Coğrafi bilgi sisteminin (CBS) rezerv tespitinde kullanılabilirliği
T DOĞAN, M ÖZKAN, Ü ÖZER, K KAPAR, A KAHRİMAN, S ERÇELEBİ
İstanbul Üniversitesi Mühendislik Fakültesi Yerbilimleri Dergisi 20 (2), 81-91, 2007
32007
Statistical prediction of high methane concentrations in underground coal mines-a case study
SG Ercelebi, C Kirmanli
Transactions of the Institution of Mining and Metallurgy, Section A (Mining …, 1999
31999
Asfaltitin Yeraltı Madencilik Yöntemleri ile Üretimi
CA Öztürk, İE Önsel, M Özkan, A Fişne, SG Erçelebi
MT Bilimsel, 1-14, 2015
22015
Investment Risk Evaluation of Siirt Madenköy Copper Mine in Turkey
MK Varol, İ Uğur, SG Erçelebi
Bilge International Journal of Science and Technology Research 3 (1), 39-50, 0
1
Tammekanîze Kömür Kazısında Tur Zamanı Hesaplamaları
M YAVUZ, SG ERÇELEBİ
Eskişehir Osmangazi Üniversitesi Mühendislik ve Mimarlık Fakültesi Dergisi …, 0
1
Room and pillar design of Istanbul-Yenikoy coal field using finite element method
SG Erçelebi, E Nasuf
Mine Planning and Equipment Selection 2000, 271-275, 2018
2018
AÇIK OCAK NİHAİ SINIRLARININ BELİRLENMESİNDE KULLANILAN YÖNTEMLER
SG ERÇELEBİ, M ÖZKAN
Selçuk Üniversitesi Mühendislik, Bilim ve Teknoloji Dergisi 2 (3), 38-53, 2014
2014
Konya-Ilgın Çavuşçu linyit sahasının bilgisayar destekli tasarım ve planlaması
SG Erçelebi
2012
Slope Stability Analysis of Underground Water Induced Failure For Kestelek Open Pit Boron Mine In Turkey
SG Ercelebi, CA Ozturk, M Ozkan, IE Onsel, T Yalcin
45th US Rock Mechanics/Geomechanics Symposium, 2011
2011
The system can't perform the operation now. Try again later.
Articles 1–20