Follow
Oğuzhan Ahmet Arık
Title
Cited by
Cited by
Year
Multi-objective fuzzy parallel machine scheduling problems under fuzzy job deterioration and learning effects
OA Arık, MD Toksarı
International Journal of Production Research 56 (7), 2488-2505, 2018
652018
Single machine scheduling problems under position-dependent fuzzy learning effect with fuzzy processing times
MD Toksari, OA Arık
Journal of Manufacturing Systems 45, 159-179, 2017
422017
Population-based Tabu search with evolutionary strategies for permutation flow shop scheduling problems under effects of position-dependent learning and linear deterioration
OA Arık
Soft Computing 25 (2), 1501–1518, 2021
372021
Additive Manufacturing Scheduling Problem Considering Assembly Operations of Parts
OA Arık
Operational Research, 2021
322021
Artificial bee colony algorithm including some components of iterated greedy algorithm for permutation flow shop scheduling problems
OA Arık
Neural Computing and Applications 33, 3469–3486, 2021
292021
Comparisons of metaheuristic algorithms for unrelated parallel machine weighted earliness/tardiness scheduling problems
OA Arık
Evolutionary Intelligence, 2019
272019
Weighted earliness/tardiness parallel machine scheduling problem with a common due date
OA Arık, M Schutten, E Topan
Expert systems with applications 187, 115916, 2022
262022
Fuzzy Parallel Machine Scheduling Problem under Fuzzy Job Deterioration and Learning Effects with Fuzzy Processing Times
OA Arık, MD Toksarı
Advanced Fuzzy Logic Approaches in Engineering Science, 2018
182018
Public transportation vehicle selection by the grey relational analysis method
G Canbulut, E Köse, OA Arık
Public Transport, 2021
162021
Artificial Bee Colony Algorithm to Forecast Natural Gas Consumption of Turkey
OA Arık
SN Applied Sciences 1 (1138), 2019
152019
Handling of revenue sharing contracts within the scope of game theory
G Canbulut, E Köse, OA Arık
Soft Computing 25 (1), pages321–329, 2021
142021
Single machine earliness/tardiness scheduling problem with grey processing times and the grey common due date
OA Arık
Grey Systems: Theory and Application, 2021
142021
Simple assembly line balancing problem of Type 1 with grey demand and grey task durations
OA Arık, E Köse, JYL Forrest
Grey Systems: Theory and Application, 2019
102019
Credibility based chance constrained programming for project scheduling with fuzzy activity durations
OA Arık
An International Journal of Optimization and Control: Theories …, 2019
82019
Fuzzy chance constrained programming technique for single machine earliness/tardiness scheduling problem under effects of fuzzy learning and deterioration
OA Arık, MD Toksarı
Sakarya University Journal of Science 22 (2), 1-1, 2018
72018
Genetic algorithm application for permutation flow shop scheduling problems
OA Arık
GAZI UNIVERSITY JOURNAL OF SCIENCE 35 (1), 92-111, 2022
62022
Public transportation vehicle selection by the grey relational analysis method. Public Transport, 14, 367-384
G Canbulut, E Köse, OA Arik
62022
A genetic algorithm approach to parallel machine scheduling problems under effects of position-dependent learning and linear deterioration: Genetic algorithm to parallel …
OA Arık, MD Toksarı
International Journal of Applied Metaheuristic Computing (IJAMC) 12 (3), 195-211, 2021
62021
Goal Programming Approach for Carrying People with Physical Disabilities
OA Arık, E Köse, G Canbulut
Promet - Traffic&Transportation 32 (4), 585-594, 2020
62020
Dissatisfaction levels of earliness and tardiness durations by relaxing common due date on single machine scheduling problems
OA Arık
Journal of Multidisciplinary Modeling and Optimization 2 (1), 1-15, 2019
62019
The system can't perform the operation now. Try again later.
Articles 1–20