A review of the current applications of genetic algorithms in assembly line balancing SO Tasan, S Tunali Journal of intelligent manufacturing 19, 49-69, 2008 | 209 | 2008 |
The state of the art on buffer allocation problem: a comprehensive survey L Demir, S Tunali, DT Eliiyi Journal of Intelligent Manufacturing 25, 371-392, 2014 | 205 | 2014 |
Joint optimization of spare parts inventory and maintenance policies using genetic algorithms MA Ilgin, S Tunali The International Journal of Advanced Manufacturing Technology 34, 594-604, 2007 | 162 | 2007 |
A review of applications of genetic algorithms in lot sizing H Guner Goren, S Tunali, R Jans Journal of Intelligent Manufacturing 21, 575-590, 2010 | 148 | 2010 |
An adaptive tabu search approach for buffer allocation problem in unreliable non-homogenous production lines L Demir, S Tunalı, DT Eliiyi Computers & Operations Research 39 (7), 1477-1486, 2012 | 73 | 2012 |
A tabu search approach for buffer allocation in production lines with unreliable machines L Demir, S Tunali, A Løkketangen Engineering Optimization 43 (2), 213-231, 2011 | 69 | 2011 |
Small response surface designs for metamodel estimation I Batmaz, S Tunali European Journal of Operational Research 145 (2), 455-470, 2003 | 58 | 2003 |
An adaptive genetic algorithm approach for the mixed-model assembly line sequencing problem OS Akgündüz, S Tunalı International Journal of Production Research 48 (17), 5157-5179, 2010 | 57 | 2010 |
Evaluation of alternate routing policies in scheduling a job-shop type FMS S Tunali Computers & industrial engineering 32 (2), 243-250, 1997 | 53 | 1997 |
A hybrid approach for the capacitated lot sizing problem with setup carryover HG Goren, S Tunali, R Jans International Journal of Production Research 50 (6), 1582-1597, 2012 | 47 | 2012 |
Cyclic scheduling of flexible mixed model assembly lines with parallel stations C Öztürk, S Tunalı, B Hnich, A Örnek Journal of Manufacturing Systems 36, 147-158, 2015 | 45 | 2015 |
A review of the current applications of genetic algorithms in mixed-model assembly line sequencing OS Akgündüz, S Tunalı International Journal of Production Research 49 (15), 4483-4503, 2011 | 45 | 2011 |
Balancing and scheduling of flexible mixed model assembly lines C Öztürk, S Tunalı, B Hnich, MA Örnek Constraints 18, 434-469, 2013 | 42 | 2013 |
Balancing and scheduling of flexible mixed model assembly lines with parallel stations C Öztürk, S Tunalı, B Hnich, A Örnek The International Journal of Advanced Manufacturing Technology 67, 2577-2591, 2013 | 37 | 2013 |
Dealing with the least squares regression assumptions in simulation metamodeling S Tunali, I Batmaz Computers & industrial engineering 38 (2), 307-320, 2000 | 34 | 2000 |
Evaluation of alternative line configurations in apparel industry using simulation C Ünal, S Tunali, M Güner Textile Research Journal 79 (10), 908-916, 2009 | 33 | 2009 |
Two approaches for solving the buffer allocation problem in unreliable production lines L Demir, S Tunalı, DT Eliiyi, A Løkketangen Computers & Operations Research 40 (10), 2556-2563, 2013 | 30 | 2013 |
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times C Ozturk, S Tunali, B Hnich, AM Ornek Electronic Notes in Discrete Mathematics 36, 65-72, 2010 | 28 | 2010 |
Capacity improvement using simulation optimization approaches: A case study in the thermotechnology industry SY Köse, L Demir, S Tunalı, DT Eliiyi Engineering Optimization 47 (2), 149-164, 2015 | 26 | 2015 |
Setting order promising times in a supply chain network using hybrid simulation-analytical approach: An industrial case study S Tunali, PM Ozfirat, G Ay Simulation Modelling Practice and Theory 19 (9), 1967-1982, 2011 | 23 | 2011 |