Monitoring systems and their effectiveness for project cost control in construction
SH Al-Jibouri
International Journal of Project Management 21 (2), 145-154, 2003
1632003
Genetic algorithms for construction site layout in project planning
MJ Mawdesley, SH Al-Jibouri, H Yang
Journal of construction engineering and management 128 (5), 418-426, 2002
1602002
Lean transformation in a modular building company: A case for implementation
H Yu, M Al-Hussein, S Al-Jibouri, A Telyas
Journal of management in engineering 29 (1), 103-111, 2013
1002013
Identifying key performance indicators for use in control of pre‐project stage process in construction
T Haponava, S Al‐Jibouri
International Journal of Productivity and Performance Management, 2009
722009
Proposed system for measuring project performance using process-based key performance indicators
T Haponava, S Al-Jibouri
Journal of management in engineering 28 (2), 140-149, 2012
632012
Automated post-simulation visualization of modular building production assembly line
SH Han, M Al-Hussein, S Al-Jibouri, H Yu
Automation in construction 21, 229-236, 2012
632012
Modelling construction project productivity using systems dynamics approach
MJ Mawdesley, S Al‐Jibouri
International Journal of Productivity and Performance Management, 2010
522010
Proposed genetic algorithms for construction site layout
MJ Mawdesley, SH Al-Jibouri
Engineering Applications of Artificial Intelligence 16 (5-6), 501-509, 2003
512003
Capturing and integrating knowledge for managing risks in tunnel works
IC Cárdenas, SSH Al‐jibouri, JIM Halman, FA van Tol
Risk Analysis: An International Journal 33 (1), 92-108, 2013
502013
Planning linear construction projects: automated method for the generation of earthwork activities
WH Askew, SH Al-Jibouri, MJ Mawdesley, DE Patterson
Automation in construction 11 (6), 643-653, 2002
432002
The enhancement of simulation based learning exercises through formalised reflection, focus groups and group presentation
M Mawdesley, G Long, S Al-Jibouri, D Scott
Computers & Education 56 (1), 44-52, 2011
392011
Effects of resource management regimes on project schedule
S Al-jibouri
International Journal of Project Management 20 (4), 271-277, 2002
392002
BIM approach for automated drafting and design for modular construction manufacturing
A Alwisy, M Al-Hussein, SH Al-Jibouri
Computing in civil engineering (2012), 221-228, 2012
332012
Ergonomic analysis and the need for its integration for planning and assessing construction tasks
N Inyang, M Al-Hussein, M El-Rich, S Al-Jibouri
Journal of construction engineering and management 138 (12), 1370-1376, 2012
322012
Influence of process performance during the construction stage on achieving end‐project goals
T Haponava, S Al‐Jibouri
Construction Management and Economics 28 (8), 853-869, 2010
312010
Design and experience with a computer game for teaching construction project planning and control
SH Al‐Jibouri, MJ Mawdesley
Engineering construction and architectural management 8 (5‐6), 418-427, 2001
292001
Post simulation visualization model for effective scheduling of modular building construction
M Moghadam, M Al-Hussein, S Al-Jibouri, A Telyas
Canadian journal of civil engineering 39 (9), 1053-1061, 2012
252012
Modeling risk‐related knowledge in tunneling projects
IC Cárdenas, SSH Al‐Jibouri, JIM Halman, FA van Tol
Risk analysis 34 (2), 323-339, 2014
242014
Site layout for earthworks in road projects
MJ Mawdesley, WH Askew, SH Al‐Jibouri
Engineering, Construction and Architectural Management, 2004
212004
The use of a simulation model as a game for teaching management of projects in construction
S Al-Jibouri, M Mawdesley, D Scott, S Gribble
International journal of engineering education 21 (6), 1195, 2005
202005