Follow
Ümit Bilge
Ümit Bilge
Verified email at boun.edu.tr
Title
Cited by
Cited by
Year
A time window approach to simultaneous scheduling of machines and material handling system in an FMS
Ü Bilge, G Ulusoy
Operations Research 43 (6), 1058-1070, 1995
3371995
A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles
G Ulusoy, F Sivrikaya-Şerifoǧlu, Ü Bilge
Computers & Operations Research 24 (4), 335-351, 1997
2771997
A tabu search algorithm for parallel machine total tardiness problem
Ü Bilge, F Kıraç, M Kurtulan, P Pekgün
Computers & Operations Research 31 (3), 397-414, 2004
2032004
Multi-mode resource constrained multi-project scheduling and resource portfolio problem
U Beşikci, Ü Bilge, G Ulusoy
European Journal of Operational Research 240 (1), 22-31, 2015
1752015
Operational aircraft maintenance routing problem with remaining time consideration
M Başdere, Ü Bilge
European Journal of Operational Research 235 (1), 315-328, 2014
1122014
AGV systems with multi-load carriers: basic issues and potential benefits
Ü Bilge, JMA Tanchoco
Journal of Manufacturing Systems 16 (3), 159-174, 1997
1001997
A tabu search algorithm for the single machine total weighted tardiness problem
Ü Bilge, M Kurtulan, F Kıraç
European Journal of Operational Research 176 (3), 1423-1435, 2007
922007
A robust disaster preparedness model for effective and fair disaster response
G Erbeyoğlu, Ü Bilge
European Journal of Operational Research 280 (2), 479-494, 2020
882020
Simultaneous scheduling of machines and automated guided vehicles
G Ulusoy, Ü Bilge
The International Journal of Production Research 31 (12), 2857-2873, 1993
781993
Resource dedication problem in a multi-project environment
U Beşikci, Ü Bilge, G Ulusoy
Flexible Services and Manufacturing Journal 25, 206-229, 2013
692013
A hierarchical approach to FMS planning and control with simulation-based capacity anticipation
E Albey, Ü Bilge
International Journal of Production Research 49 (11), 3319-3342, 2011
482011
An exploratory study of disaggregated clearing functions for production systems with multiple products
E Albey, Ü Bilge, R Uzsoy
International Journal of Production Research 52 (18), 5301-5322, 2014
462014
Robust supply chain network design with multi-products for a company in the food sector
N Aras, Ü Bilge
Applied mathematical modelling 60, 526-539, 2018
452018
A parametric fuzzy logic approach to dynamic part routing under full routing flexibility
Ü Bilge, M Fırat, E Albey
Computers & Industrial Engineering 55 (1), 15-33, 2008
422008
Multi-attribute responsive dispatching strategies for automated guided vehicles
Ü Bilge, G Esenduran, N Varol, Z Öztürk, B Aydın, A Alp
International Journal of Production Economics 100 (1), 65-75, 2006
422006
Multi-dimensional clearing functions for aggregate capacity modelling in multi-stage production systems
E Albey, Ü Bilge, R Uzsoy
International Journal of Production Research 55 (14), 4164-4179, 2017
312017
Material handling considerations in the FMS loading problem with full routing flexibility
D Koşucuoğlu, Ü Bilge
International Journal of Production Research 50 (22), 6530-6552, 2012
242012
Facility layout problem with QAP formulation under scenario-based uncertainty
M Şahinkoç, Ü Bilge
INFOR: Information Systems and Operational Research 56 (4), 406-427, 2018
172018
PSO-based and SA-based metaheuristics for bilinear programming problems: an application to the pooling problem
G Erbeyoğlu, Ü Bilge
Journal of Heuristics 22, 147-179, 2016
132016
Simultaneous scheduling of machines and material handling system in an FMS
G Ulusoy, Ü Bilge
IFAC Proceedings Volumes 25 (8), 15-25, 1992
121992
The system can't perform the operation now. Try again later.
Articles 1–20