Follow
Osman Hürol Türkakın
Osman Hürol Türkakın
Research Assistant
Verified email at istanbul.edu.tr - Homepage
Title
Cited by
Cited by
Year
Delay analysis in construction projects with no updated work schedules
OH Türkakın, E Manisalı, D Arditi
Engineering, Construction and Architectural Management 27 (10), 2893-2909, 2020
212020
A construction project scheduling methodology considering COVID-19 pandemic measures
S Aslan, OH Türkakın
Journal of safety research 80, 54-66, 2022
182022
Comparison of heuristic priority rules in the solution of the resource-constrained project scheduling problem
OH Türkakın, D Arditi, E Manisalı
Sustainability 13 (17), 9956, 2021
62021
Solution of facility location problem in Turkey by using fuzzy C-means method
MN Kocakaya, OH Türkakın
AIP Conference Proceedings 1558 (1), 433-436, 2013
42013
A Review of BIM Adoption in Turkey: Practitioners' Viewpoint
MN Kocakaya, OH Türkakin, Ö Giran
International Journal of 3-D Information Modeling (IJ3DIM) 7 (4), 59-68, 2018
32018
Non-Linear programing for sizing optimization of truss structures
G Bekdaş, SM Nigdeli, OH Türkakin
32017
Multi-objective optimization for LEED-new construction using BIM and genetic algorithms
I Alothaimeen, D Arditi, OH Türkakın
Automation in Construction 149, 104807, 2023
12023
A Scientometric Analysis and a Review on Current Literature of Computer Vision Applications
OH Türkakın
Artificial Intelligence and Machine Learning Applications in Civil …, 2020
12020
İnşaat Yönetiminde Çok Ölçütlü Bir Karar Verme Yöntemi VIKOR ile İş Makinesi Seçimi
M ANBARCI, E MANİSALI, Ö GİRAN, OH TÜRKAKIN
12016
Location-Based Tracking and Monitoring Infrastructural Construction Works by Using Business Intelligence Tool
O Giran, OH Türkakın, M Anbarcı
Engineering Management Journal, 1-12, 2023
2023
Cantilever Soldier Pile Design: The Multiobjective Optimization of Cost and CO2 Emission via Pareto Front Analysis
G Bekdaş, ZA Arama, OH Türkakın, AE Kayabekir, ZW Geem
Sustainability 14 (15), 9416, 2022
2022
Using The MACBETH Method To Solve The Construction Site Manager Selection Problem
M Anbarci̇, E Manisali̇, Ö Giran, OH Türkaki̇n
2020
Grouping Concept in Optimum Sizing of Truss Structures: Optimization of Truss Structures
G Bekdaş, SM Nigdeli, OH Türkakın
Handbook of Research on Predictive Modeling and Optimization Methods in …, 2018
2018
An Efficient Genetic Algorithm Method For Large Population Solutions
OH TÜRKAKIN, E MANİSALI
METAHEURISTICS AND ENGINEERING, 185, 2014
2014
Yüksek Gradyanlı Sıcaklık Değişiminde Termal Gerilme Analizi
OH Türkakın
Fen Bilimleri Enstitüsü, 2010
2010
Handbook of Research on Predictive Modeling and Optimization Methods in Science and Engineering
SM NİGDELİ, OH TÜRKAKIN, G BEKDAŞ
Igı Global., 0
The Performance of Heuristic Rules in Resource Constrained Project Scheduling
OH TÜRKAKIN
Examination of Projects of Privately-Owned Residential Buildings
S Aslan, M Sevil, OH Türkakın
Bir Kamu İnşaat Projesinde CPM Uygulamamasından Dolayı Ortaya Çıkan Problemler–Vaka Analizi
ML Zalmai, OH Türkakın, E Manisalı
Time Cost Trade off Optimization Using Harmony Search and Monte-Carlo Method
M Lemar, OH Türkakın, E MANİSALI
The system can't perform the operation now. Try again later.
Articles 1–20