Follow
Amir Azaron
Title
Cited by
Cited by
Year
A multi-objective stochastic programming approach for supply chain design considering risk
A Azaron, KN Brown, SA Tarim, M Modarres
International Journal of Production Economics 116 (1), 129-138, 2008
4622008
Solving a dynamic cell formation problem using metaheuristics
R Tavakkoli-Moghaddam, MB Aryanezhad, N Safaei, A Azaron
Applied Mathematics and Computation 170 (2), 761-780, 2005
1772005
A genetic algorithm approach for the time-cost trade-off in PERT networks
A Azaron, C Perkgoz, M Sakawa
Applied mathematics and computation 168 (2), 1317-1339, 2005
1692005
Improved estimation of electricity demand function by using of artificial neural network, principal component analysis and data envelopment analysis
A Kheirkhah, A Azadeh, M Saberi, A Azaron, H Shakouri
Computers & Industrial Engineering 64 (1), 425-441, 2013
1182013
A hybrid method for solving stochastic job shop scheduling problems
R Tavakkoli-Moghaddam, F Jolai, F Vaziri, PK Ahmed, A Azaron
Applied mathematics and computation 170 (1), 185-206, 2005
1172005
Dynamic shortest path in stochastic dynamic networks: Ship routing problem
A Azaron, F Kianfar
European Journal of Operational Research 144 (1), 138-156, 2003
932003
Robust and fuzzy goal programming optimization approaches for a novel multi-objective hub location-allocation problem: A supply chain overview
A Ghodratnama, R Tavakkoli-Moghaddam, A Azaron
Applied Soft Computing 37, 255-276, 2015
872015
The use of a GERT based method to model concurrent product development processes
RG Nelson, A Azaron, S Aref
European journal of operational research 250 (2), 566-578, 2016
812016
Pharmacological therapy selection of type 2 diabetes based on the SWARA and modified MULTIMOORA methods under a fuzzy environment
M Eghbali-Zarch, R Tavakkoli-Moghaddam, F Esfahanian, MM Sepehri, ...
Artificial intelligence in medicine 87, 20-33, 2018
792018
Risk assessment for highway projects using jackknife technique
SM Mousavi, R Tavakkoli-Moghaddam, A Azaron, SMH Mojtahedi, ...
Expert Systems with Applications 38 (5), 5514-5524, 2011
782011
Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm
A Azaron, C Perkgoz, H Katagiri, K Kato, M Sakawa
Computers & Operations Research 36 (5), 1562-1571, 2009
742009
A multi-objective resource allocation problem in PERT networks
A Azaron, H Katagiri, M Sakawa, K Kato, A Memariani
European journal of operational research 172 (3), 838-854, 2006
732006
Multi-objective time–cost trade-off in dynamic PERT networks using an interactive approach
A Azaron, R Tavakkoli-Moghaddam
European Journal of Operational Research 180 (3), 1186-1200, 2007
712007
A differential evolution algorithm to solve multi-skilled project portfolio scheduling problems
H Kazemipoor, R Tavakkoli-Moghaddam, P Shahnazari-Shahrezaei, ...
The International Journal of Advanced Manufacturing Technology 64, 1099-1111, 2013
662013
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
G Moslehi, M Mirzaee, M Vasei, M Modarres, A Azaron
International Journal of Production Economics 122 (2), 763-773, 2009
662009
An adaptive network based fuzzy inference system–genetic algorithm clustering ensemble algorithm for performance assessment and improvement of conventional power plants
A Azadeh, M Saberi, M Anvari, A Azaron, M Mohammadi
Expert Systems with Applications 38 (3), 2224-2234, 2011
572011
Reliability evaluation of multi-component cold-standby redundant systems
A Azaron, H Katagiri, K Kato, M Sakawa
Applied Mathematics and Computation 173 (1), 137-149, 2006
562006
Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert
R Tavakkoli-Moghaddam, G Moslehi, M Vasei, A Azaron
Applied Mathematics and Computation 167 (2), 1430-1450, 2005
562005
A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms
C Perkgoz, A Azaron, H Katagiri, K Kato, M Sakawa
European Journal of Operational Research 180 (1), 292-308, 2007
512007
Modelling complex assemblies as a queueing network for lead time control
A Azaron, H Katagiri, K Kato, M Sakawa
European Journal of Operational Research 174 (1), 150-168, 2006
512006
The system can't perform the operation now. Try again later.
Articles 1–20