Frank Werner
Başlık
Alıntı yapanlar
Alıntı yapanlar
Yıl
Depth of maximum of air-shower profiles at the Pierre Auger Observatory. I. Measurements at energies above
A Aab, P Abreu, M Aglietta, EJ Ahn, I Al Samarai, IFM Albuquerque, ...
Physical Review D 90 (12), 122005, 2014
4342014
A dynamic model and an algorithm for short-term supply chain scheduling in the smart factory industry 4.0
D Ivanov, A Dolgui, B Sokolov, F Werner, M Ivanova
International Journal of Production Research 54 (2), 386-402, 2016
4172016
Multimessenger observations of a flaring blazar coincident with high-energy neutrino IceCube-170922A
L Telescope, M Aartsen, M Ackermann, J Adams, JA Aguilar, M Ahlers, ...
Science 361 (6398), 2018
3562018
Depth of maximum of air-shower profiles at the Pierre Auger Observatory. II. Composition implications
A Aab, P Abreu, M Aglietta, EJ Ahn, I Al Samarai, IFM Albuquerque, ...
Physical Review D 90 (12), 122006, 2014
3302014
Muons in air showers at the Pierre Auger Observatory: Mean number in highly inclined events
A Aab, P Abreu, M Aglietta, EJ Ahn, I Al Samarai, IFM Albuquerque, ...
Physical Review D 91 (3), 032003, 2015
2652015
Searches for anisotropies in the arrival directions of the highest energy cosmic rays detected by the Pierre Auger Observatory
A Aab, P Abreu, M Aglietta, EJ Ahn, I Al Samarai, IFM Albuquerque, ...
The Astrophysical Journal 804 (1), 15, 2015
2482015
Science with the Cherenkov Telescope Array
BS Acharya, I Agudo, I Al Samarai, R Alfaro, J Alfaro, C Alispach, ...
236*2017
Improved limit to the diffuse flux of ultrahigh energy neutrinos from the Pierre Auger Observatory
A Aab, P Abreu, M Aglietta, EJ Ahn, I Al Samarai, IFM Albuquerque, ...
Physical Review D 91 (9), 092008, 2015
2222015
A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
J Jungwattanakit, M Reodecha, P Chaovalitwongse, F Werner
Computers & Operations Research 36 (2), 358-378, 2009
1832009
Scheduling with common due date, earliness and tardiness penalties for multimachine problems: A survey
V Lauff, F Werner
Mathematical and Computer Modelling 40 (5-6), 637-655, 2004
1652004
Algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
J Jungwattanakit, M Reodecha, P Chaovalitwongse, F Werner
The International Journal of Advanced Manufacturing Technology 37 (3), 354-370, 2008
1512008
A toadstool among the mushrooms: Screening decisions and image theory's compatibility test
LR Beach, E Strom
Acta Psychologica 72 (1), 1-12, 1989
1381989
Antennas for the detection of radio emission pulses from cosmic-ray induced air showers at the Pierre Auger Observatory
P Abreu, M Aglietta, M Ahlers, EJ Ahn, IFM Albuquerque, D Allard, ...
Journal of Instrumentation 7 (10), P10011, 2012
1342012
Heuristics for hybrid flow shops with controllable processing times and assignable due dates
JND Gupta, K Krüger, V Lauff, F Werner, YN Sotskov
Computers & Operations Research 29 (10), 1417-1439, 2002
1332002
Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties
J Bank, F Werner
Mathematical and computer modelling 33 (4-5), 363-383, 2001
1322001
Blockchain-oriented dynamic modelling of smart contract design and execution in the supply chain
A Dolgui, D Ivanov, S Potryasaev, B Sokolov, M Ivanova, F Werner
International Journal of Production Research 58 (7), 2184-2199, 2020
1282020
Constraints on the origin of cosmic rays above 1018 ev from large-scale anisotropy searches in data of the pierre auger observatory
P Abreu, M Aglietta, M Ahlers, EJ Ahn, IFM Albuquerque, D Allard, ...
The Astrophysical Journal Letters 762 (1), L13, 2012
1282012
Muons in air showers at the Pierre Auger Observatory: Measurement of atmospheric production depth
A Aab, P Abreu, M Aglietta, M Ahlers, EJ Ahn, I Al Samarai, ...
Physical Review D 90 (1), 012012, 2014
1212014
Insertion techniques for the heuristic solution of the job shop problem
F Werner, A Winkler
Discrete Applied Mathematics 58 (2), 191-211, 1995
1211995
Parallel machine scheduling problems with a single server
SA Kravchenko, F Werner
Mathematical and Computer Modelling 26 (12), 1-11, 1997
1161997
Sistem, işlemi şu anda gerçekleştiremiyor. Daha sonra yeniden deneyin.
Makaleler 1–20