Backward-forward hybrid genetic algorithm for resource-constrained multiproject scheduling problem
R Sonmez, F Uysal
Journal of Computing in Civil Engineering 29 (5), 04014072, 2015
492015
Resource constrained project scheduling with stochastic resources
F Uysal, SK Işleyen, C Cetinkaya
Journal of applied research on industrial engineering 5 (1), 39-49, 2018
172018
Critical sequence crashing heuristic for resource-constrained discrete time–cost trade-off problem
R Sonmez, MA Iranagh, F Uysal
Journal of construction engineering and management 142 (3), 04015090, 2016
162016
A transformative solution for construction safety: Blockchain-based system for accident information management
S Ahmadisheykhsarmast, S Aminbakhsh, R Sonmez, F Uysal
Journal of Industrial Information Integration 35, 100491, 2023
82023
A graphical processing unit‐based parallel hybrid genetic algorithm for resource‐constrained multi‐project scheduling problem
F Uysal, R Sonmez, SK Isleyen
Concurrency and Computation: Practice and Experience 33 (16), e6266, 2021
72021
Geographic information system–based visualization system for planning and monitoring of repetitive construction projects
R Sonmez, F Uysal
Canadian Journal of civil engineering 35 (11), 1342-1346, 2008
72008
Comparison of Traffic Accident Injury Severity Prediction Models with Explainable Machine Learning
E Cicek, M Akin, F Uysal, RM Topcu Aytas
Transportation Letters, 1-12, 2023
62023
Bootstrap Aggregated Case-Based Reasoning Method for Conceptual Cost Estimation
F Uysal, R Sonmez
Buildings 13 (3), 651, 2023
52023
A GPS/GIS based line of balance method for planning and control of construction projects
F Uysal
METU Institute for Graduate Studies, 2007
32007
A Smart Contract Framework as an Alternative Method for Letter of Credit Use in Construction Procurement
F Uysal, S Ahmadisheykhsarmast, R Sonmez
Proceedings of The Twelfth International Conference on Construction in the …, 2022
22022
Hybrid Meta-heuristic Algorithms for the Resource Constrained Multi-project Scheduling Problem
F Uysal
METU Institute for Graduate Studies, 2014
22014
Decision Tree Analysis in Project Risk Management: A Systematic Review
A ZAKU, F UYSAL
Proceedings of The Twelfth International Conference on Construction in the …, 2022
1*2022
Discussion of “Artificial Intelligence and Parametric Construction Cost Estimate Modeling: State-of-the-Art Review” by Haytham H. Elmousalami
R Sonmez, F Uysal
Journal of Construction Engineering and Management 147 (6), 07021001, 2021
12021
Investigating the Impact of Blockchain on Project Risk Management Success: A Structural Equation Model
S Demirkesen, A Tezel, F Uysal, Z Ozturk
IEEE Transactions on Engineering Management, 2024
2024
A Memetic Algorithm for the Solution of the Resource Leveling Problem
M Iranagh, R Sonmez, T Atan, F Uysal, ÖH Bettemir
Buildings 13 (11), 2738, 2023
2023
Resource Constrained Project Scheduling Problem: An Analytical Approach
F Uysal, SK İşleyen, C Çetinkaya, Ç Nazmiye
5th International Conference Industrial Engineering and Enviromental …, 2015
2015
Planning of Linear Construction Projects Using Geographic Information Systems
R Sonmez, F Uysal
Proceedings of the Fifth International Conference on Construction in the …, 2009
2009