Follow
Tankut Atan
Tankut Atan
Industrial Engineering, Bahcesehir University
Verified email at bau.edu.tr
Title
Cited by
Cited by
Year
Optimal project duration for resource leveling
T Atan, E Eren
European Journal of Operational Research 266 (2), 508-520, 2018
362018
From revenue management concepts to software systems
N Secomandi, K Abbott, T Atan, EA Boyd
Interfaces 32 (2), 1-11, 2002
362002
Auxiliary tool allocation in flexible manufacturing systems
TS Atan, R Pandit
European journal of operational research 89 (3), 642-659, 1996
301996
Re-mining item associations: Methodology and a case study in apparel retailing
A Demiriz, G Ertek, T Atan, U Kula
Decision Support Systems 52 (1), 284-293, 2011
292011
Hospital site selection using fuzzy EDAS method: case study application for districts of Istanbul
M Yılmaz, T Atan
Journal of Intelligent & Fuzzy Systems 41 (2), 2591-2602, 2021
282021
Minimization of rest mismatches in round robin tournaments
T Atan, B Çavdaroğlu
Computers & Operations Research 99, 78-89, 2018
272018
Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem
R Sonmez, S Aminbakhsh, T Atan
Journal of Construction Engineering and Management 146 (8), 04020084, 2020
212020
Determining matchdays in sports league schedules to minimize rest differences
B Çavdaroğlu, T Atan
Operations Research Letters 48 (3), 209-216, 2020
182020
Simultaneous scheduling of football games and referees using Turkish league data
T Atan, OP Hüseyinoǧlu
International Transactions in Operational Research 24 (3), 465-484, 2017
162017
A rollout-based application of the scatter search/path relinking template to the multi-vehicle routing problem with stochastic demands and restocking
T Atan, N Secomandi
PROS Revenue Management, Inc., Houston, TX, 1999
91999
Re-mining positive and negative association mining results
A Demiriz, G Ertek, T Atan, U Kula
Advances in Data Mining. Applications and Theoretical Aspects: 10th …, 2010
82010
Dynamic frontier estimation for monitoring team performances: A case on Turkish first division football league
M Yılmaz, Ç Aksezer, T Atan
Team Performance Management: An International Journal 25 (3/4), 212-228, 2019
62019
Round-robin scheduling with regard to rest differences
T Tuffaha, B Çavdaroğlu, T Atan
TOP 31 (2), 269-301, 2023
52023
A mixed integer model for optimization of discrete time cost tradeoff problem
AC Tatar, M Bilir, R Sonmez, T Atan
Creative Construction Conference, 478-485, 2016
42016
Integrated break and carryover effect minimization
B Çavdaroğlu, T Atan
Journal of Scheduling 25 (6), 705-719, 2022
32022
Solution methods for controlled queueing networks
ST Atan
Iowa State University, 1997
21997
A Memetic Algorithm for the Solution of the Resource Leveling Problem
M Iranagh, R Sonmez, T Atan, F Uysal, ÖH Bettemir
Buildings 13 (11), 2738, 2023
12023
A Unified Multiplicative Group Best-Worst Method with a New Assessment Approach for Dissimilar Markets
T Atan, GT Temur
Informatica 34 (3), 465-489, 2023
12023
Timetabling Round Robin Tournaments with the Consideration of Rest Durations
T Tuffaha, B Çavdaroglu, T Atan
Proceedings of the 13th International Conference on the Practice and Theory …, 2021
12021
Auxiliary equipment allocation in flexible manufacturing systems
ST Atan
Iowa State University, 1993
11993
The system can't perform the operation now. Try again later.
Articles 1–20