Z. Pelin Bayindir
Title
Cited by
Cited by
Year
Dynamic lot sizing with product returns and remanufacturing
RH Teunter, ZP Bayindir, WV Den Heuvel
International Journal of Production Research 44 (20), 4377-4400, 2006
2222006
Assessing the benefits of remanufacturing option under one-way substitution and capacity constraint
ZP Bayındır, N Erkip, R Güllü
Computers & Operations Research 34 (2), 487-514, 2007
992007
A model to evaluate inventory costs in a remanufacturing environment
ZP Bayındır, N Erkip, R Güllü
International Journal of Production Economics 81, 597-607, 2003
852003
Assessing the benefits of remanufacturing option under one-way substitution
ZP Bayındır, N Erkip, R Güllü
Journal of the Operational Research Society 56 (3), 286-296, 2005
542005
Optimal pricing and production decisions in utilizing reusable containers
B Atamer, İS Bakal, ZP Bayındır
International Journal of Production Economics 143 (2), 222-232, 2013
512013
An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse
E Topan, ZP Bayındır, T Tan
Operations Research Letters 38 (5), 454-461, 2010
452010
Determination of recovery effort for a probabilistic recovery system under various inventory control policies
ZP Bayındır, R Dekker, E Porras
Omega 34 (6), 571-584, 2006
372006
A two‐sided cumulative sum chart for first‐order integer‐valued autoregressive processes of poisson counts
P Yontay, CH Weiß, MC Testik, Z Pelin Bayindir
Quality and Reliability Engineering International 29 (1), 33-42, 2013
302013
A deterministic inventory/production model with general inventory cost rate function and piecewise linear concave production costs
ZP Bayındır, Şİ Birbil, JBG Frenk
European Journal of Operational Research 179 (1), 114-123, 2007
292007
The joint replenishment problem with variable production costs
ZP Bayındır, Şİ Birbil, JBG Frenk
European Journal of Operational Research 175 (1), 622-640, 2006
272006
Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures
E Topan, ZP Bayındır, T Tan
European Journal of Operational Research 256 (1), 126-138, 2017
242017
Remedial actions for disassembly lines with stochastic task times
FT Altekin, ZP Bayındır, V Gümüşkaya
Computers & Industrial Engineering 99, 78-96, 2016
212016
Multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse under compound Poisson demand
E Topan, ZP Bayindir
Journal of the Operational Research Society 63 (8), 1143-1152, 2012
172012
Analyzing the effects of inventory cost setting rules in a disassembly and recovery environment
E Akcali, ZP Bayindir
International Journal of Production Research 46 (1), 267-288, 2008
132008
Value of disruption information in an EOQ environment
İS Bakal, ZP Bayındır, DE Emer
European Journal of Operational Research 263 (2), 446-460, 2017
122017
Locating emergency vehicles with an approximate queuing model and a meta-heuristic solution approach
MA Akdoğan, ZP Bayındır, C Iyigun
Transportation Research Part C: Emerging Technologies 90, 134-155, 2018
82018
A comparison of inventory control policies for a joint manufacturing/Remanufacturing environment with remanufacturing yield loss
P Bayindir, R Teunter, R Dekker
Report/Econometric Institute, Erasmus University Rotterdam, 2005
72005
Spare parts inventory control-an overview of issues for a large industrial complex
R Dekker, ZP Bayindir
International IMS Forum 2004-Global Challenges in Manufacturing Part I, 180-187, 2004
62004
A healthcare facility location problem for a multi-disease, multi-service environment under risk aversion
S Taymaz, C Iyigun, ZP Bayindir, NP Dellaert
Socio-Economic Planning Sciences 71, 100755, 2020
52020
Location analysis of emergency vehicles using an approximate queueing model
MA Akdogan, ZP Bayındır, C Iyigun
Transportation research procedia 22, 430-439, 2017
52017
The system can't perform the operation now. Try again later.
Articles 1–20