Yassine Ouazene
Başlık
Alıntı yapanlar
Alıntı yapanlar
Yıl
Lot-sizing in a multi-stage flow line production system with energy consideration
O Masmoudi, A Yalaoui, Y Ouazene, H Chehade
International Journal of Production Research 55 (6), 1640-1663, 2017
412017
Production scheduling optimisation with machine state and time-dependent energy costs
MM Aghelinejad, Y Ouazene, A Yalaoui
International Journal of Production Research 56 (16), 5558-5575, 2018
302018
Lot-sizing in flow-shop with energy consideration for sustainable manufacturing systems
O Masmoudi, A Yalaoui, Y Ouazene, H Chehade
IFAC-PapersOnLine 48 (3), 727-732, 2015
232015
Incorporating the human factor within manufacturing dynamics
F Fruggiero, S Riemma, Y Ouazene, R Macchiaroli, V Guglielmi
IFAC-PapersOnLine 49 (12), 1691-1696, 2016
222016
Multi-item capacitated lot-sizing problem in a flow-shop system with energy consideration
O Masmoudi, A Yalaoui, Y Ouazene, H Chehade
IFAC-PapersOnLine 49 (12), 301-306, 2016
162016
Workload balancing in identical parallel machine scheduling using a mathematical programming method
Y Ouazene, F Yalaoui, H Chehade, A Yalaoui
International Journal of Computational Intelligence Systems 7 (sup1), 58-67, 2014
162014
Complexity analysis of energy-efficient single machine scheduling problems
MM Aghelinejad, Y Ouazene, A Yalaoui
Operations Research Perspectives 6, 100105, 2019
152019
Solving a capacitated flow-shop problem with minimizing total energy costs
O Masmoudi, A Yalaoui, Y Ouazene, H Chehade
The International Journal of Advanced Manufacturing Technology 90 (9-12 …, 2017
152017
Fuzzy-metaheuristic methods to solve a hybrid flow shop scheduling problem with pre-assignment
N Yalaoui, Y Ouazene, F Yalaoui, L Amodeo, H Mahdi
International Journal of Production Research 51 (12), 3609-3624, 2013
142013
Machine and production scheduling under electricity time varying prices
MM Aghelinejad, Y Ouazene, A Yalaoui
2016 IEEE International Conference on Industrial Engineering and Engineering …, 2016
132016
Crane scheduling problem with non-interference constraints in a steel coil distribution centre
GN Maschietto, Y Ouazene, MG Ravetti, MC de Souza, F Yalaoui
International Journal of Production Research 55 (6), 1607-1622, 2017
102017
The Joint Load Balancing and Parallel Machine Scheduling Problem
Y Ouazene, F Hnaien, F Yalaoui, L Amodeo
Operations Research Proceedings 2010: Selected Papers of the Annual …, 2011
102011
Equivalent machine method for approximate evaluation of buffered unreliable production lines
Y Ouazene, H Chehade, A Yalaoui, F Yalaoui
2013 IEEE Symposium on Computational Intelligence in Production and …, 2013
92013
New restricted enumeration method for production line design optimization
Y Ouazene, H Chehade, A Yalaoui
IFAC Proceedings Volumes 45 (6), 1347-1352, 2012
92012
Preemptive scheduling of a single machine with finite states to minimize energy costs
MM Aghelinejad, Y Ouazene, A Yalaoui
International Conference on Optimization and Decision Science, 591-599, 2017
72017
Identical parallel machine scheduling with time-dependent processing times
Y Ouazene, F Yalaoui
Theoretical Computer Science 721, 70-77, 2018
62018
THROUGHPUT ANALYSIS OF TWO-MACHINE-ONE-BUFFER LINE MODEL: A COMPARATIVE STUDY
Y OUAZENE, A YALAOUI, H CHEHADE
Uncertainty Modeling in Knowledge Engineering and Decision Making 7, 1281-1286, 2012
62012
Semi-parallel flow shop with a final synchronization operation scheduling problem
IFG Guimarães, Y Ouazene, MC de Souza, F Yalaoui
IFAC-PapersOnLine 49 (12), 1032-1037, 2016
52016
Non-linear programming method for buffer allocation in unreliable production lines
Y Ouazene, A Yalaoui, F Yalaoui, H Chehade
International Conference on Analytical and Stochastic Modeling Techniques …, 2014
52014
A new formulation of buffered two-workstation production line with parallel unreliable machines
Y Ouazene, A Yalaoui, H Chehade, F Yalaoui
10th Industrial Simulation Conference'ISC 2012, 2012
52012
Sistem, işlemi şu anda gerçekleştiremiyor. Daha sonra yeniden deneyin.
Makaleler 1–20