Follow
Harun TÜRKOĞLU
Title
Cited by
Cited by
Year
Identification of root causes of construction and demolition (C&D) waste: The case of Turkey
G Polat, A Damci, H Turkoglu, AP Gurgun
Procedia engineering 196, 948-955, 2017
952017
Identification of material-related risks in green buildings
G Polat, H Turkoglu, AP Gurgun
Procedia engineering 196, 956-963, 2017
252017
Formwork system selection criteria for building construction projects: a structural equation modelling approach
T Terzioglu, G Polat, H Turkoglu
Buildings 12 (2), 204, 2022
172022
Analysis of formwork system selection criteria for building construction projects: A comparative study
T Terzioglu, G Polat, H Turkoglu
Buildings 11 (12), 618, 2021
162021
Analysis of Industrial Formwork Systems Supply Chain Using Value Stream Mapping.
T Terzioglu, G Polat, H Turkoglu
Journal of Engineering, Project & Production Management 12 (1), 2022
152022
Formwork systems selection criteria for building construction projects: A critical review of the literature
T Terzioglu, H Turkoglu, G Polat
Canadian Journal of Civil Engineering 49 (4), 617-626, 2022
152022
Heavy equipment scheduling for horizontal construction projects
GE Gurcanli, H Turkoglu, S Bilir
Procedia Engineering 182, 265-273, 2017
132017
Detection of unbalanced bids: A case study
G Polat, H Turkoglu, A Damci
Creative Construction Conference, CCC, 432-439, 2018
92018
Motivation of civil engineers and architects in Turkey
A Damci, D Arditi, G Polat, H Turkoglu
Organization, technology & management in construction: an international …, 2020
82020
Detecting unbalanced bids via an improved grading-based model
G Polat, H Turkoglu, A Damci, F Dogu Akin
Organization, technology & management in construction: an international …, 2020
72020
A crashing-based time-cost trade-off model considering quality cost and contract clauses
FD Akin, G Polat, H Turkoglu, A Damci
International Journal of Construction Management 23 (6), 954-963, 2021
62021
A grading system-based model for detecting unbalanced bids during the tendering process
G Polat, H Turkoglu, A Damci
Periodica Polytechnica Architecture 50 (2), 139-147, 2019
62019
Traditional vs. industrial formwork system supply chains
T Terzioglu, G Polat, H Turkoglu
International Civil Engineering and Architecture Conference, Trabzon, Turkey …, 2019
62019
A comparative study on selecting urban renewal project via different MADM methods
G Polat, H Turkoglu, A Damci, I Demirli
Journal of Construction Engineering, Management & Innovation 2 (3), 131-143, 2019
62019
Schedule risk assessment in green building projects
AP Gurgun, HG Bayhan, G Polat, H Turkoglu
Proceedings of International Structural Engineering and Construction, 13.1-13.6, 2018
62018
Use of float consumption rate in resource leveling of construction projects
A Damci, G Polat, FD Akin, H Turkoglu
Frontiers of Engineering Management, 1-13, 2022
52022
An integrative literature review on the causes of delays in construction projects: evidence from developing countries
O Selcuk, H Turkoglu, G Polat, M Hajdu
International Journal of Construction Management 24 (6), 610-622, 2024
42024
Crashing construction projects considering schedule flexibility: an illustrative example
H Turkoglu, G Polat, FD Akin
International Journal of Construction Management 23 (4), 619-628, 2023
42023
A risk-based approach to prevent unbalanced bids
F Akin, A Damci, G Polat, H Turkoglu
Proc., 6th Int. Project and Construction Management Conf.(e-IPCMC2020 …, 2020
32020
Structural System Selection Using the Integration of Multi-Attribute-Decision-Making (MADM) Methods
G Polat, H Turkoglu, A Damci
Periodica Polytechnica Architecture 49 (1), 38-46, 2018
32018
The system can't perform the operation now. Try again later.
Articles 1–20