Follow
Onur Behzat Tokdemir
Onur Behzat Tokdemir
Verified email at itu.edu.tr - Homepage
Title
Cited by
Cited by
Year
Challenges in line-of-balance scheduling
D Arditi, OB Tokdemir, K Suh
Journal of construction engineering and management 128 (6), 545-556, 2002
2462002
Effect of learning on line-of-balance scheduling
D Arditi, OB Tokdemir, K Suh
International journal of project management 19 (5), 265-277, 2001
1892001
Comparison of case-based reasoning and artificial neural networks
D Arditi, OB Tokdemir
Journal of computing in civil engineering 13 (3), 162-169, 1999
1611999
Predicting the outcome of construction litigation using neural networks
D Arditi, FE Oksay, OB Tokdemir
Computer‐Aided Civil and Infrastructure Engineering 13 (2), 75-81, 1998
1181998
Accident analysis for construction safety using latent class clustering and artificial neural networks
BU Ayhan, OB Tokdemir
Journal of Construction Engineering and Management 146 (3), 04019114, 2020
972020
Scheduling system for high rise building construction
D Arditi, P Sikangwan, OB Tokdemir
Construction Management & Economics 20 (4), 353-364, 2002
892002
Using case‐based reasoning to predict the outcome of construction litigation
D Arditi, OB Tokdemir
Computer‐Aided Civil and Infrastructure Engineering 14 (6), 385-393, 1999
891999
Predicting the outcome of construction incidents
BU Ayhan, OB Tokdemir
Safety Science 113, 91-104, 2019
822019
Safety assessment in megaprojects using artificial intelligence
BU Ayhan, OB Tokdemir
Safety Science 118, 273-287, 2019
642019
Scheduling system for repetitive unit construction using line‐of‐balance technology
D Arditi, OB Tokdemir, K Suh
Engineering, Construction and Architectural Management 8 (2), 90-103, 2001
632001
Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation
OB Tokdemir, H Erol, I Dikmen
Journal of Construction Engineering and Management 145 (2), 04018132, 2019
612019
Prediction of highway bridge performance by artificial neural networks and genetic algorithms
OB Tokdemir, J MOHAMMADİ
442000
ALISS: advanced linear scheduling system
OB Tokdemir, D Arditi, C Balcik
Construction Management and Economics 24 (12), 1253-1267, 2006
432006
A decentralized structure to reduce and resolve construction disputes in a hybrid blockchain network
M Saygili, IE Mert, OB Tokdemir
Automation in construction 134, 104056, 2022
332022
An association rule mining model for the assessment of the correlations between the attributes of severe accidents
B Ayhan, N Dogan, O Tokdemir
Journal of civil engineering and management 26 (4), 2020
222020
BIM execution process of construction companies for building projects
B Gerçek, OB Tokdemir, ME İlal, HM Günaydın
ISEC 2017 - 9th International Structural Engineering and Construction …, 2017
152017
BIM-based facility management models for existing buildings
K Soliman, K Naji, M Gunduz, O Tokdemir, F Faqih, T Zayed
Journal of Engineering Research 10 (1A), 21-37, 2022
112022
Automated Identification of Vagueness in the FIDIC Silver Book Conditions of Contract
AB Candaş, OB Tokdemir
Journal of Construction Engineering and Management 148 (4), 04022007, 2022
102022
Construction Safety Risk Model with Construction Accident Network: A Graph Convolutional Network Approach
F Mostofi, V Toğan, YE Ayözen, OB Tokdemir
Sustainability 14 (23), 15906, 2022
72022
Integrating lean construction into the civil engineering curriculum
D Kuzucuoglu, BU Ayhan, OB Tokdemir
72019
The system can't perform the operation now. Try again later.
Articles 1–20