Claims and project performance between traditional and alternative project delivery methods MS Hashem M. Mehany, G Bashettiyavar, B Esmaeili, G Gad Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2018 | 53 | 2018 |
Comparative life cycle assesment (LCA) and life cycle cost analysis (LCCA) of precast and cast–in–place buildings in United States T Vasishta, MH Mehany, J Killingsworth Journal of Building Engineering 67, 105921, 2023 | 36 | 2023 |
Causes of road and bridge construction claims: Analysis of Colorado department of transportation projects MS Hashem M. Mehany, N Grigg Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2015 | 30 | 2015 |
A literature survey of the fracking economic and environmental implications in the United States MSHM Mehany, A Guggemos Procedia engineering 118, 169-176, 2015 | 30 | 2015 |
Lean construction principles past and present–a business model consistency M Mehany ASC Proceedings of the 51st Annual Conference, 2015 | 15 | 2015 |
General contractors’ experience using off-site structural framing systems J Killingsworth, MH Mehany, H Ladhari Construction Innovation 21 (1), 40-63, 2021 | 14 | 2021 |
An evaluation of training delivery methods’ effects on construction safety training and knowledge retention-a foundational study MS Hashem M. Mehany, J Killingsworth, S Shah International Journal of Construction Education and Research 17 (1), 18-36, 2021 | 14 | 2021 |
Analyzing the feasibility of fracking in the US using macro level life cycle cost analysis and assessment approaches—A foundational study MSHM Mehany, S Kumar Sustainable Production and Consumption 20, 375-388, 2019 | 14 | 2019 |
COVID-19 pandemic impacts on construction projects H Ataei, D Becker, JR Hellenbrand, MSHM Mehany, TE Mitchell, ... American Society of Civil Engineers, 2021 | 12 | 2021 |
Integrating Building Information Models and Building Operation Information Exchange Systems in a Decision Support Framework for Facilities Management M Sadeghi, M Mehany, K Strong Construction Research Congress 2018, 770-779, 2018 | 12 | 2018 |
Knowledge, skills, and abilities for senior-level construction managers: a us industry-based Delphi study RT Pathuri, J Killingsworth, MSHM Mehany International Journal of Construction Education and Research 18 (3), 234-250, 2022 | 10 | 2022 |
Automatic verification of facilities management handover building information models M Sadeghi, JW Elliott, MSHM Mehany Construction Research Congress 2020, 488-497, 2020 | 9 | 2020 |
Delay claims in road construction: Best practices for a standard delay claims management system MS Hashem M. Mehany, N Grigg Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2016 | 9 | 2016 |
Implications of collection period variance in the construction industry J Killingsworth, MH Mehany Journal of financial management of property and construction 23 (3), 330-348, 2018 | 8 | 2018 |
Dispute prevention and resolution methods used on public highway projects employing different project delivery methods MHM Mehany, GM Gad, B Esmaeili Transportation Research Board 96th Annual MeetingTransportation Research Board, 2017 | 8 | 2017 |
A standardized framework for quantitative assessment of cities’ socioeconomic resilience and its improvement measures S Kumar, MSHM Mehany Socio-Economic Planning Sciences 79, 101141, 2022 | 6 | 2022 |
Identifying cost centers and environmental impacts needs assessment for fracking life cycle in the United States MSHM Mehany Procedia Engineering 145, 444-451, 2016 | 6 | 2016 |
Risk management for asphalt road construction and maintenance under performance-based contracts MS Hashem M. Mehany, A Guggemos International Journal of Construction Education and Research 11 (4), 292-315, 2015 | 6 | 2015 |
Service Learning Project (SLP) implementation and assessment in a construction management program–a case study S Olbina, M Mehany, K Jesse Proceedings of the 54th ASC Annual International Conference, 18-21, 2018 | 5 | 2018 |
Risk-Managed Lifecycle Costing for Asphalt Road Construction and Maintenance Projects Under Performance-Based Contracts MSHM Mehany, AA Guggemos ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A …, 2016 | 5 | 2016 |