A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions LR de Abreu, KAG Araújo, B de Athayde Prata, MS Nagano, JV Moccellin Engineering Optimization 54 (9), 1563-1582, 2022 | 19 | 2022 |
The integrated cutting and packing heterogeneous precast beams multiperiod production planning problem KAG de Araújo, TO e Bonates, B de Athayde Prata RAIRO-Operations Research 55 (4), 2491-2524, 2021 | 6 | 2021 |
Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods KAG Araújo, TO Bonates, BA Prata, AR Pitombeira-Neto https://doi.org/10.1007/s11750-020-00589-4, 2021 | 5 | 2021 |
Relax-and-Fix Heuristics Applied to a Real-World Lot Sizing and Scheduling Problem in the Personal Care Consumer Goods Industry KAG Araujo, EG Birgin, MS Kawamura, DP Ronconi Operations Research Forum 4 (2), 47, 2023 | 4 | 2023 |
Hybrid matheuristics for the multi-capacitated clustering problem KAG de Araújo, JB Guedes, B de Athayde Prata RAIRO-Operations Research 56 (3), 1167-1185, 2022 | 4 | 2022 |
Modeling and scheduling hybrid open shops for makespan minimization KAG Araújo, T Oliveira e Bonates, BA Prata Journal of Modelling in Management 17 (4), 1566-1586, 2022 | 3 | 2022 |
Models, constructive heuristics, and benchmark instances for the flexible job shop scheduling problem with sequencing flexibility and position-based learning effect KAG Araújo, EG Birgin, DP Ronconi arXiv preprint arXiv:2403.16766, 2024 | 1 | 2024 |
Contributions to the multiperiod production planning of heterogeneous precast beams KAG Araújo | 1 | 2019 |
UM METODO PRIMAL-DUAL PARA O PROBLEMA DO CAMINHO MÍNIMO EM DIGRAFOS NA PRESENC A DE CICLOS ABSORVENTES RC de Andrade, KAG de Araújo, RD Saraiva | 1 | 2015 |
Local search and trajectory metaheuristics for the flexible job shop scheduling problem with sequencing flexibility and position-based learning effect KAG Araújo, EG Birgin, DP Ronconi arXiv preprint arXiv:2403.16787, 2024 | | 2024 |
A constraint programming model for the flexible job shop scheduling problem with sequencing flexibility and position based learning effects KAG Araujo, EJG Birgin, DP Ronconi Anais, 2022 | | 2022 |
Problema integrado de corte e empacotamento do planejamento de produção multiperíodo de vigas pré-moldadas heterogêneas KAG Araújo, TO Bonates, BA Prata | | 2019 |
Heterogeneous Prestressed Precast Beams Multiperiod Production Planning Problem: Modeling and Solution Methods K Araujo, T Bonates, B Prata, A Pitombeira Neto https://arxiv.org/abs/1903.08609, 2019 | | 2019 |
Modelagem e Solução do Problema de Planejamento de Produção Multi-período de Vigas Protendidas Heterogêneas K Araujo Universidade Federal do Ceará, 2016 | | 2016 |