Follow
Adnene Hajji
Adnene Hajji
Verified email at fsa.ulaval.ca
Title
Cited by
Cited by
Year
Production control and replenishment strategy with multiple suppliers
A Hajji, A Gharbi, JP Kenne, R Pellerin
European Journal of Operational Research 208 (1), 67-74, 2011
632011
Joint replenishment and manufacturing activities control in a two stage unreliable supply chain
A Hajji, A Gharbi, JP Kenné
International Journal of Production Research 47 (12), 3231-3251, 2009
572009
Joint supplier selection, production and replenishment of an unreliable manufacturing-oriented supply chain
R Hlioui, A Gharbi, A Hajji
International Journal of Production Economics 187, 53-67, 2017
552017
Joint production, setup and preventive maintenance policies of unreliable two-product manufacturing systems
M Assid, A Gharbi, A Hajji
International Journal of Production Research 53 (15), 4668-4683, 2015
552015
Production rate control of an unreliable manufacturing cell with adjustable capacity
A Gharbi, A Hajji, K Dhouib
International Journal of Production Research 49 (21), 6539-6557, 2011
552011
Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups
A Gharbi, JP Kenné, A Hajji
International Journal of Production Research 44 (3), 545-567, 2006
552006
A deep learning predictive model for selective maintenance optimization
H Hesabi, M Nourelfath, A Hajji
Reliability Engineering & System Safety 219, 108191, 2022
462022
Replenishment, production and quality control strategies in three-stage supply chain
R Hlioui, A Gharbi, A Hajji
International Journal of Production Economics 166, 90-102, 2015
462015
Dynamic pricing models for ERP systems under network externality
A Hajji, R Pellerin, PM Léger, A Gharbi, G Babin
International Journal of Production Economics 135 (2), 708-715, 2012
452012
Time-cost trade-offs in resource-constraint project scheduling problems with overlapping modes
F Berthaut, R Pellerin, N Perrier, A Hajji
International Journal of Project Organisation and Management 6 (3), 215-236, 2014
442014
Optimal production control policy in unreliable batch processing manufacturing systems with transportation delay
B Bouslah, A Gharbi, R Pellerin, A Hajji
International Journal of Production Research 51 (1), 264-280, 2013
372013
Production and set-up control of a failure-prone manufacturing system
A Hajji, A Gharbi, JP Kenné
International Journal of Production Research 42 (6), 1107-1130, 2004
372004
Environmental issue in an alternative production–maintenance control for unreliable manufacturing system subject to degradation
A Ben-Salem, A Gharbi, A Hajji
The International Journal of Advanced Manufacturing Technology 77, 383-398, 2015
362015
Production and setup control policy for unreliable hybrid manufacturing-remanufacturing systems
M Assid, A Gharbi, A Hajji
Journal of Manufacturing Systems 50, 103-118, 2019
342019
Joint production and setup control policies: an extensive study addressing implementation issues via quantitative and qualitative criteria
M Assid, A Gharbi, A Hajji
The International Journal of Advanced Manufacturing Technology 72, 809-826, 2014
322014
Production planning of an unreliable hybrid manufacturing–remanufacturing system under uncertainties and supply constraints
M Assid, A Gharbi, A Hajji
Computers & Industrial Engineering 136, 31-45, 2019
312019
Integrated quality strategy in production and raw material replenishment in a manufacturing-oriented supply chain
R Hlioui, A Gharbi, A Hajji
The International Journal of Advanced Manufacturing Technology 81, 335-348, 2015
292015
An Environmental Hedging Point Policy to control production rate and emissions in unreliable manufacturing systems
A Ben-Salem, A Gharbi, A Hajji
International Journal of Production Research 53 (2), 435-450, 2015
292015
Production planning and opportunistic preventive maintenance for unreliable one-machine two-products manufacturing systems
M Assid, A Gharbi, A Hajji
IFAC-PapersOnLine 48 (3), 478-483, 2015
292015
Production control of unreliable manufacturing systems producing defective items
F Mhada, A Hajji, R Malhame, A Gharbi, R Pellerin
Journal of Quality in Maintenance Engineering 17 (3), 238-253, 2011
292011
The system can't perform the operation now. Try again later.
Articles 1–20