Takip et
Yoonho Seo
Yoonho Seo
고려대학교 산업경영공학부 교수
korea.ac.kr üzerinde doğrulanmış e-posta adresine sahip
Başlık
Alıntı yapanlar
Alıntı yapanlar
Yıl
An efficient genetic algorithm for the traveling salesman problem with precedence constraints
C Moon, J Kim, G Choi, Y Seo
European Journal of Operational Research 140 (3), 606-617, 2002
3532002
Evolutionary algorithm for advanced process planning and scheduling in a multi-plant
C Moon, Y Seo
Computers & Industrial Engineering 48 (2), 311-325, 2005
1732005
Mobile robot path planning with surrounding point set and path improvement
J Han, Y Seo
Applied Soft Computing 57, 35-47, 2017
1352017
A tabu search algorithm for simultaneous machine/AGV scheduling problem
Y Zheng, Y Xiao, Y Seo
International Journal of Production Research 52 (19), 5748-5763, 2014
1192014
Modelling and implementation of internet-based virtual machine tools
SH Suh, Y Seo, SM Lee, TH Choi, GS Jeong, DY Kim
The International Journal of Advanced Manufacturing Technology 21, 516-522, 2003
982003
Block assembly planning in shipbuilding using case-based reasoning
Y Seo, D Sheen, T Kim
Expert Systems with Applications 32, 245–253, 2007
742007
An improved particle swarm optimization for the resource-constrained project scheduling problem
Q Jia, Y Seo
The International Journal of Advanced Manufacturing Technology 67, 2627-2638, 2013
732013
Adaptive genetic algorithm for advanced planning in manufacturing supply chain
C Moon, Y Seo, Y Yun, M Gen
Journal of Intelligent Manufacturing 17, 509-522, 2006
642006
Integrated machine tool selection and operation sequencing with capacity and precedence constraints using genetic algorithm
C Moon, M Lee, Y Seo, YH Lee
Computers & industrial engineering 43 (3), 605-621, 2002
582002
Flexible guidepath design for automated guided vehicle systems
Y Seo, PJ Egbelu
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 33 (4), 1135-1156, 1995
521995
Development of web-based CAM system
Y Seo, DY Kim, SH Suh
The International Journal of Advanced Manufacturing Technology 28, 101-108, 2006
442006
Integrated manufacturing planning for an AGV-based FMS
Y Seo, PJ Egbelu
International Journal of Production Economics 60, 473-478, 1999
441999
Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation
Q Jia, Y Seo
Computers & Operations Research 40 (8), 2037-2050, 2013
392013
Structure modeling of machine tools and internet-based implementation
Y Seo, DP Hong, I Kim, T Kim, D Sheen, GB Lee
Proceedings of the Winter Simulation Conference, 2005., 6 pp., 2005
352005
A two-step heuristic algorithm for layout design of unequal-sized facilities with input/output points
Y Xiao, Y Seo, M Seo
International Journal of Production Research 51 (14), 4200-4222, 2013
342013
Process plan selection based on product mix and production volume
Y Seo, PJ Egbelu
International Journal of Production Research 34 (9), 2639-2655, 1996
301996
An effective coding approach for multiobjective integrated resource selection and operation sequences problem
H Zhang, M Gen, Y Seo
Journal of Intelligent Manufacturing 17, 385-397, 2006
272006
Tabu search algorithm for flexible flow path design of unidirectional automated-guided vehicle systems
Y Seo, C Lee, C Moon
OR spectrum 29, 471-487, 2007
242007
Advanced planning for minimizing makespan with load balancing in multi-plant chain
C Moon, Y Seo*
International journal of production research 43 (20), 4381-4396, 2005
172005
Path planning for a mobile robot using ant colony optimization and the influence of critical obstacle
J Han, H Park, Y Seo
Proceedings of the 2016 International Conference on Industrial Engineering …, 2016
142016
Sistem, işlemi şu anda gerçekleştiremiyor. Daha sonra yeniden deneyin.
Makaleler 1–20