Takip et
Saman Aminbakhsh
Saman Aminbakhsh
Department of Civil Engineering, Atilim University
atilim.edu.tr üzerinde doğrulanmış e-posta adresine sahip
Başlık
Alıntı yapanlar
Alıntı yapanlar
Yıl
Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects
S Aminbakhsh, M Gunduz, R Sonmez
Journal of safety research 46, 99-105, 2013
5032013
Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem
S Aminbakhsh, R Sonmez
Expert Systems with Applications 51, 177-185, 2016
1082016
Pareto front particle swarm optimizer for discrete time-cost trade-off problem
S Aminbakhsh, R Sonmez
Journal of Computing in Civil Engineering 31 (1), 04016040, 2017
472017
High-dimensional optimization of large-scale steel truss structures using guided stochastic search
SK Azad, S Aminbakhsh
Structures 33, 1439-1456, 2021
282021
Activity Uncrashing Heuristic with Noncritical Activity Rescheduling Method for the Discrete Time-Cost Trade-Off Problem
R Sonmez, S Aminbakhsh, T Atan
Journal of Construction Engineering and Management 146 (8), 04020084, 2020
172020
Multi-stage guided stochastic search for optimization and standardization of free-form steel double-layer grids
SK Azad, S Aminbakhsh, SSS Shaban
Structures 34, 678-699, 2021
102021
ε-constraint guided stochastic search with successive seeding for multi-objective optimization of large-scale steel double-layer grids
SK Azad, S Aminbakhsh
Journal of Building Engineering 46, 103767, 2022
82022
A transformative solution for construction safety: Blockchain-based system for accident information management
S Ahmadisheykhsarmast, S Aminbakhsh, R Sonmez, F Uysal
Journal of Industrial Information Integration 35, 100491, 2023
62023
Tamsayılı Doğrusal Programlama Yöntemiyle Kesikli Zaman-Maliyet Ödünleşim Probleminin Optimal Pareto Çözümü
S Aminbakhsh, R Sonmez
4. Proje ve Yapım Yönetimi Kongresi, 2016
62016
Hybrid particle swarm optimization algorithm for obtaining pareto front of discrete time cost trade-off problem
S Aminbakhsh
Middle East Technical University, 2013
62013
Resource allocation capabilities of commercial project management software packages for resource leveling and resource constrained project scheduling problems: A comparative study
N Albayati, S Aminbakhsh
Journal of Construction Engineering, Management & Innovation 6 (2), 104, 2023
22023
Heuristic and Exact Methods for the Large-Scale Discrete Time-Cost Trade-off Problems
S Aminbakhsh
PhD Thesis, Civil Engineering Department, Middle East Technical University, 2018
12018
Optimization-based Scheduling of Construction Projects with Generalized Precedence Relationships: A Real-Life Case Study
S Aminbakhsh, A Ahmed
Scientia Iranica, 2023
2023
An ε-Constraint Method with Adaptive Mode Elimination Scheme for Multi-Objective Mixed Integer Programming
S Aminbakhsh
Creative Construction Conference (CCC2023), 2023
2023
Integrating a Meta-Heuristic Method into Microsoft Project for Time-Cost Trade-off Analyses
S Aminbakhsh, R Sonmez, S Aminbakhsh, T Atan, M Bilir
5th International Project and Construction Management Conference (IPCMC 2018), 2018
2018
A Heuristic for Resource-Constrained Multi-Project Discrete Time-Cost Trade-Off Problem
B Seyisoglu, S Aminbakhsh, R Sonmez
5th International Project and Construction Management Conference (IPCMC 2018), 2018
2018
An efficient heuristic method for Pareto oriented optimization of timecost tradeoff problem for construction projects
S Aminbakhsh, R Sonmez
The XVIII Congress of the Portuguese Association of Operational Research, 2017
2017
Pareto Oriented Optimization of Discrete Time-Cost Trade-Off Problem Using Particle Swarm Optimization
S Aminbakhsh, R Sonmez
31st Annual ARCOM Conference (Association of Researchers in Construction …, 2015
2015
Kuş Sürüsü Optimizasyon Algoritması ile Kesikli Zaman-Maliyet Ödünleşim Probleminin Çözümü
S Aminbakhsh, R Sonmez
3. Proje ve Yapım Yönetimi Kongresi, 2014
2014
Türk Müteahhitlerin İran İnşaat Sektöründe Karşılaşabilecekleri Risklerin İncelenmesi
A Haghgooei, S Aminbakhsh
2. Proje ve Yapım Yönetimi Kongresi, 2012
2012
Sistem, işlemi şu anda gerçekleştiremiyor. Daha sonra yeniden deneyin.
Makaleler 1–20