Follow
Fletcher Griffis
Title
Cited by
Cited by
Year
Bidding strategy: winning over key competitors
FH Griffis
Journal of Construction Engineering and Management 118 (1), 151-165, 1992
581992
Qualifications-based selection of professional A/E services
S Christodoulou, FH Griffis, L Barrett, M Okungbowa
Journal of Management in Engineering 20 (2), 34-41, 2004
552004
Integration of engineering, design, and construction
KF Reinschmidt, FH Griffis, PL Bronner
Journal of construction engineering and management 117 (4), 756-772, 1991
551991
An analysis of the impacts of using three dimensional computer models in the management of construction
FH Griffis, DB Hogan, W Li
Construction Industry Institute, University of Texas at Austin, 1995
531995
Construction planning for engineers
F Griffis, J Farr
McGraw Hill, 2000
512000
Pricing engineering services
CS Sturts, FH Griffis
Journal of Management in Engineering 21 (2), 56-62, 2005
422005
Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis
G Gelisen, FH Griffis
Journal of Construction Engineering and Management 140 (4), B4013007, 2014
342014
Optimizing haul fleet size using queueing theory
FH Griffis Jr
Journal of the Construction Division 94 (1), 75-88, 1968
301968
Case for cost-plus contracting
FH Griffis, FM Butler
Journal of construction engineering and management 114 (1), 83-94, 1988
271988
Compensation structure and contingency allocation in integrated project delivery
M Liu, AJ Bates
2013 ASEE Annual Conference & Exposition, 23.312. 1-23.312. 12, 2013
262013
Building information model: The role and need of the constructors
P Aslani, FH Griffis, L Chiarelli
Construction Research Congress 2009: Building a Sustainable Future, 467-476, 2009
252009
Addressing pricing: Value bidding for engineers and consultants
CS Sturts, FH Griffis
Journal of construction engineering and management 131 (6), 621-630, 2005
252005
Construction risk analysis tool for determining liquidated damages insurance premiums: Case study
FH Griffis, S Christodoulou
Journal of construction engineering and management 126 (6), 407-413, 2000
252000
Engineering failures exposed by Hurricane Katrina
FH Griffis
Technology in Society 29 (2), 189-195, 2007
242007
ADR, TQM, partnering, and other management fantasies
FHB Griffis
Journal of professional issues in engineering education and practice 118 (4 …, 1992
201992
Three-dimensional Computer Models and the Fully Integrated and Automated Project Process for the Management of Construction: A Report of Best Practices; a Report to the …
FH Griffis, C Sturts
Construction Industry Institute, 2000
172000
Procurement of services and materials using a FIAPP-based system—New York City case studies
K Subsomboon, S Christodoulou, FH Griffis
Construction Research Congress: Wind of Change: Integration and Innovation, 1-9, 2003
142003
Design of public projects: Outsource or in-house?
FH Griffis, H Choi
Journal of Management in Engineering 29 (1), 2-9, 2013
132013
Infrastructure of New York City: A policymakers' guide
FH Griffis
NICEST, 1996
91996
FIAPP and the three-dimensional computer model
FH Griffis, CS Sturts
Construction Congress VI: Building Together for a Better Tomorrow in an …, 2000
82000
The system can't perform the operation now. Try again later.
Articles 1–20