Follow
Saeed Tasouji Hassanpour
Title
Cited by
Cited by
Year
Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown
A Adressi, S Tasouji Hassanpour, V Azizi
Decision Science Letters 5 (1), 157-168, 2016
242016
A Time-Dependant Location-Routing Problem of Hazardous Material Transportation with Edge Unavailability and Time Window
S Tasouji Hassanpour, G Y. Ke, D M.Tulett
Journal of Cleaner Production, 128951, 2021
192021
Infectious waste management during a pandemic: A stochastic location-routing problem with chance-constrained time windows
S Tasouji Hassanpour, GY Ke, J Zhao, DM Tulett
Computers & Industrial Engineering, 109066, 2023
132023
Solving Re-entrant No-wait Flow Shop Scheduling Problem
S Tasouji Hassanpour, MR Amin-Naseri, N Nahavandi
International Journal of Engineering (IJE) 28 (6), 903-912, 2015
9*2015
Beta-backscattering thickness-meter design and evaluation with fuzzy TOPSIS method
A Arjhangmehr, M Mohammadzadeh, SAH Feghhi, S Tasouji Hassanpour
Nukleonika 59 (2), 53-59, 2014
32014
Solving group scheduling problem in no-wait flow shop with sequence dependent setup times
A Adressi, R Bashirzadeh, V Azizi, S Tasouji Hassanpour
Journal of Modern Processes in Manufacturing and Production 3 (1), 5-16, 2014
32014
Scheduling problem of virtual cellular manufacturing systems (VCMS); Using simulated annealing and genetic algorithm based heuristics
ST Hassanpour, R Bashirzadeh, A Adressi, B Bahmankhah
Journal of Modern Processes in Manufacturing and Production 3 (4), 2014
32014
A multi-stage decision framework for managing hazardous waste logistics with random release dates
ST Hassanpour, GY Ke, J Zhao, DM Tulett
Expert Systems with Applications 232, 120750, 2023
12023
Multi–Objective Robust Optimization for Index Tracking Portfolio Selection Problem
S Tasouji Hassanpour, G Y. Ke, S Ordikhani
GDN 2020, Local Proceedings, 2020
2020
A Literature Review on Robust Vehicle Routing Problem with Time Windows
S Tasouji Hassanpour, G Y. Ke
ASAC 2020, Proceedings, 2020
2020
Re-entrant No-wait Flow Shop Scheduling Problem
S Tasouji Hassanpour, MR Amin-Naseri, A Adressi
Journal of Industrial Engineering Research in Production Systems 4 (9), 271-279, 2017
2017
Scheduling two-machine no-wait open shops to minimize makespan (In Persian)
O Rajabi, S Tasouji Hassanpour
Second National Conference on Industrial Engineering and Systems, 2014
2014
A Solution for Virtual Cellular Manufacturing System's Scheduling Problem Using an Ant Colony Optimization Model (In Persian)
S Tasouji Hassanpour, R Bashirzadeh, A Adressi
9th International Conference on Industrial Engineering, Tehran, Iran, 2013
2013
THD minimization in cascade multi-level inverters with a few DC sources and optimum voltage levels
S Tasouji Hassanpour, A Arjhangmehr, SAH Feghhi, E Mostafapour
International Journal of Control 3 (2), 58-67, 2013
2013
The system can't perform the operation now. Try again later.
Articles 1–14