Ozlem Senvar
Title
Cited by
Cited by
Year
Hospital site selection via hesitant fuzzy TOPSIS
O Senvar, I Otay, E Bolturk
IFAC-PapersOnLine 49 (12), 1140-1145, 2016
732016
Multi criteria supplier selection using fuzzy PROMETHEE method
O Senvar, G Tuzkaya, C Kahraman
Supply chain management under fuzziness, 21-34, 2014
712014
Healthcare failure mode and effects analysis under fuzziness
C Kahraman, İ Kaya, Ö Şenvar
Human and Ecological Risk Assessment: An International Journal 19 (2), 538-552, 2013
602013
Usage of metaheuristics in engineering: A literature review
O Senvar, E Turanoglu, C Kahraman
Meta-heuristics optimization algorithms in engineering, business, economics …, 2013
312013
Supply chain management under fuzziness
C Kahraman, B Oztaysi
Recent Developments and Techniques 313, 1860-0808, 2014
272014
Fuzzy Process Capability Indices Using Clements' Method for Non-Normal Processes.
O Senvar, C Kahraman
Journal of Multiple-Valued Logic & Soft Computing 22, 2014
202014
Type-2 fuzzy process capability indices for non-normal processes
O Senvar, C Kahraman
Journal of Intelligent & Fuzzy Systems 27 (2), 769-781, 2014
202014
Supply chain performance measurement: an integrated DEMATEL and Fuzzy-ANP approach
O Senvar, UR Tuzkaya, C Kahraman
Supply chain management under fuzziness, 143-165, 2014
192014
Comparing performances of clements, box-cox, Johnson methods with weibull distributions for assessing process capability
O Senvar, B Sennaroglu
Journal of Industrial Engineering and Management 9 (3), 634-656, 2016
182016
Process capability and six sigma methodology including fuzzy and lean approaches
O Senvar, H Tozan
Products and services; from R&D to final solutions, 2010
182010
A research survey: heuristic approaches for solving multi objective flexible job shop problems.
A Türkyılmaz, Ö Şenvar, İ Ünal, S Bulkan
Journal of Intelligent Manufacturing 31 (8), 2020
142020
Performance comparison of box-cox transformation and weighted variance methods with weibull distribution
B Sennaroğlu, Ö Şenvar
Journal of Aeronautics and Space Technologies 8 (2), 49-55, 2015
132015
A fuzzy design of single and double acceptance sampling plans
C Kahraman, ET Bekar, O Senvar
Intelligent decision making in quality management, 179-211, 2016
122016
Process capability and six sigma methodology including fuzzy and lean approaches
Ö Şenvar, H Tozan
Products And Services: From R&D To Final Solutions. Rijeka: Intech, Cop, 153-178, 2010
122010
A literature survey on metaheuristics in production systems
SÇ Onar, B Öztayşi, C Kahraman, S Yanık, Ö Şenvar
Metaheuristics for Production Systems, 1-24, 2016
102016
An overview to industry 4.0
O Senvar, E Akkartal
International Journal of Information, Business and Management 10 (4), 50-57, 2018
92018
Oil consumption forecasting in Turkey using artificial neural network
E Turanoglu, O Senvar, C Kahraman
International Journal of Energy Optimization and Engineering (IJEOE) 1 (4 …, 2012
92012
An overview of capability evaluation of Measurement Systems and Gauge Repeatability and Reproducibility Studies
O Senvar, SUO Firat
International Journal of Metrology and Quality Engineering 1 (2), 121-127, 2010
92010
Selection of optimal renewable energy investment project via fuzzy ANP
S Hamal, O Senvar, O Vayvay
Journal of Economics Finance and Accounting 5 (2), 224-233, 2018
82018
A systematic customer oriented approach based on hesitant fuzzy AHP for performance assessments of service departments
O Senvar
Advances in Fuzzy Logic and Technology 2017, 289-300, 2017
82017
The system can't perform the operation now. Try again later.
Articles 1–20