Comparison of multi layer perceptron (MLP) and radial basis function (RBF) for construction cost estimation: the case of Turkey S Bayram, ME Ocal, E Laptali Oral, CD Atis Journal of Civil Engineering and Management 22 (4), 480-490, 2016 | 72 | 2016 |
Comparison of neural network, Gaussian regression, support vector machine, long short-term memory, multi-gene genetic programming, and M5 Trees methods for solving civil … E Uncuoglu, H Citakoglu, L Latifoglu, S Bayram, M Laman, M Ilkentapar, ... Applied Soft Computing 129, 109623, 2022 | 68 | 2022 |
Efficacy of estimation methods in forecasting building projects’ costs S Bayram, S Al-Jibouri Journal of construction engineering and management 142 (11), 05016012, 2016 | 48 | 2016 |
Duration prediction models for construction projects: In terms of cost or physical characteristics? S Bayram KSCE journal of civil engineering 21, 2049-2060, 2017 | 41 | 2017 |
Modeling monthly reference evapotranspiration process in Turkey: application of machine learning methods S Bayram, H Çıtakoğlu Environmental Monitoring and Assessment 195 (1), 67, 2023 | 37 | 2023 |
Yapım maliyeti tahmininde birim fiyat yöntemi-yapı yaklaşık maliyetleri kıyaslaması S Bayram, ME Öcal, EL Oral, CD Atiş Politeknik Dergisi 19 (2), 175-183, 2016 | 16* | 2016 |
Application of reference class forecasting in Turkish public construction projects: contractor perspective S Bayram, S Al-Jibouri Journal of management in engineering 32 (3), 05016002, 2016 | 15 | 2016 |
Cost forecasting using RCF: a case study for planning public building projects costs in Turkey S Bayram, S Al-Jibouri International journal of construction management 18 (5), 405-417, 2018 | 14 | 2018 |
Türkiye’de yapı üretiminde ve denetiminde yaşanan etik sorunlar S Bayram, S Aydınlı, A Budak, E Oral Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 24 (3), 461-467, 2018 | 13* | 2018 |
Adoption of BIM concept in the Turkish AEC industry Ö Elmalı, S Bayram Iranian Journal of Science and Technology, Transactions of Civil Engineering …, 2022 | 11 | 2022 |
Şantiyelerde yaşanan güncel iş kazaları, çalışan farkındalıkları ve eğitim seviyeleri arasındaki ilişki S Bayram Çukurova Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi 33 (1), 241-252, 2018 | 10 | 2018 |
Analysis of cost and schedule variances in construction works with artificial intelligence approaches: The case of Turkey S Bayram, ME Ocal, EL Oral International Student Conference of Civil Engineering, 2013 | 9 | 2013 |
İnşaat Mühendisliği Öğrencilerinin Mesleki Beklentileri ve Kariyer Planları S AYDINLI, GT Çelik, S Bayram, O Emel Yükseköğretim Dergisi 10 (1), 38-50, 2020 | 6* | 2020 |
Mühendislik öğrencilerinin öğrenim yeterlilikleri ve mesleki yetkinlikleri: inşaat mühendisliği öğrenci perspektifi S Bayram, G Çelik, E Oral Turkish Journal of Education 4 (1), 4-18, 2015 | 6* | 2015 |
Yapı Bilgi Modellemesi (YBM) Kapsamında Geleneksel Metraj ile Yazılımın Karşılaştırılması S BAYRAM Yapı Bilgi Modelleme 2 (2), 58-65, 2020 | 5 | 2020 |
Reference Class Forecasting Method in Predicting Construction Project Duration S Bayram, ALJ Saad Süleyman Demirel Üniversitesi Fen Bilimleri Enstitüsü Dergisi 22 (3), 1132-1142, 2018 | 5 | 2018 |
İNŞAAT ATIKLARI KAVRAMININ YASAL DÜZENLEMESİ VE HAZIR BETON TESİSİNDE ÖRNEK UYGULAMA S Bayram, ME Öcal, EL Oral Engineering Sciences 7 (1), 106-118, 2012 | 5 | 2012 |
ÇAĞIMIZIN MESLEK HASTALIĞI MOBBİNG VE YAPI SEKTÖRÜNDE BİR ARAŞTIRMA S Bayram, ZÖP Biçer Çukurova Üniversitesi Sosyal Bilimler Enstitüsü Dergisi 30 (1), 58-67, 2021 | 4 | 2021 |
Türkiye kamu inşaat projelerindeki maliyet ve süre sapmalarının yapay zekâ yöntemleri ile kıyaslamalı analizi'' S Bayram Kayseri: Erciyes University, 2013 | 4 | 2013 |
Revised unit price practice in Turkish construction works S Bayram J. Constr. Eng. Manage. Innovation 1 (4), 162-170, 2018 | 3 | 2018 |