Risk assessment and management for supply chain networks: A case study G Tuncel, G Alpan Computers in industry 61 (3), 250-259, 2010 | 526 | 2010 |
Applications of Petri nets in production scheduling: a review G Tuncel, GM Bayhan The International Journal of Advanced Manufacturing Technology 34, 762-773, 2007 | 109 | 2007 |
A comparative analysis of activity-based costing and traditional costing DE Akyol, G Tuncel, GM Bayhan World Academy of Science, Engineering and Technology 3 (12), 44-47, 2005 | 109 | 2005 |
Two-sided assembly line balancing using teaching–learning based optimization algorithm G Tuncel, D Aydin Computers & Industrial Engineering 74, 291-299, 2014 | 62 | 2014 |
Assembly line balancing with positional constraints, task assignment restrictions and station paralleling: A case in an electronics company G Tuncel, S Topaloglu Computers & Industrial Engineering 64 (2), 602-609, 2013 | 58 | 2013 |
A fuzzy analytic hierarchy process methodology for the supplier selection problem P Mızrak Özfirat, G Tuna Taşoglu, G Tunçel Memiş Journal of Enterprise Information Management 27 (3), 292-301, 2014 | 42 | 2014 |
Depo yönetiminde sipariş toplama sistemleri: bir literatür araştırması G Tuna, G Tunçel Dokuz Eylül Üniversitesi Mühendislik Fakültesi Mühendislik Bilimleri Dergisi …, 2012 | 13 | 2012 |
A heuristic rule-based approach for dynamic scheduling of flexible manufacturing systems G Tuncel Multiprocessor Scheduling: Theory and Applications, 315-22, 2007 | 13 | 2007 |
A High-Level Petri Net based decision support system for real-time scheduling and control of flexible manufacturing systems: an object-oriented approach G Tuncel, GM Bayhan International Conference on Computational Science, 843-851, 2005 | 11 | 2005 |
Application of activity-based costing in a manufacturing company: A comparison with traditional costing G Tuncel, DE Akyol, GM Bayhan, U Koker Computational Science–ICCS 2005: 5th International Conference, Atlanta, GA …, 2005 | 8 | 2005 |
An integrated modeling approach for shop-floor scheduling and control problem of flexible manufacturing systems G Tuncel The International Journal of Advanced Manufacturing Technology 59, 1127-1142, 2012 | 6 | 2012 |
A High-level Petri Net Based Modeling Approach for Risk Management in Supply Chain Networks G Tuncel, G Alpan 21st European Simulation and Modeling Conference-ESM 2007, 178-185, 2007 | 6 | 2007 |
How can risks be managed in logistics networks G Tuncel Dangerous Materials: Control, Risk Prevention and Crisis Management: From …, 2010 | 4 | 2010 |
An Analysis of Activity-Based Costing in a Manufacturing System DE Akyol, G Tuncel, GM Bayhan International Journal of Industrial and Manufacturing Engineering 1 (11 …, 2007 | 4 | 2007 |
Modelling, behavioral analysis and performance evaluation of an automotive assembly plant using petri nets GM Bayhan, G Tuncel INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND …, 2002 | 3 | 2002 |
Simulation of multi-crane single and dual cycling strategies in a container terminal E Deniz, G Tuncel, Ö Yalçınkaya, S Esmer DAAAM International Vienna, 2021 | 2 | 2021 |
Order picking systems in warehouse management: a literature review G Tuna, G Tunçel Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 14 …, 2012 | 1 | 2012 |
Chaotic time series analysis of acid rain in Türkiye A Sener, G Tuncel, M Kamislioglu International Journal of Global Warming 32 (1), 1-28, 2024 | | 2024 |
Coordination Mechanism as a Mitigation Action to Manage Supply Chain Risks G Alpan, VD Cung, F Mangione, G Tuncel Supply Chain Performance: Collaboration, Alignment and Coordination, 239-266, 2013 | | 2013 |
DEPO YÖNETİMİNDE SİPARİŞ TOPLAMA SİSTEMLERİ: BİR LİTERATÜR ARAŞTIRMASI T Gökçeçiçek, G TUNÇEL Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 14 …, 2012 | | 2012 |