Takip et
Gursel Suer
Gursel Suer
Professor of Industrial and Systems Engineering, Ohio University
ohio.edu üzerinde doğrulanmış e-posta adresine sahip
Başlık
Alıntı yapanlar
Alıntı yapanlar
Yıl
Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method
D Castro-Lacouture, GA Süer, J Gonzalez-Joaqui, JK Yates
Journal of Construction Engineering and Management 135 (10), 1096-1104, 2009
1122009
Optimal operator assignment and cell loading in labor-intensive manufacturing cells
GA Süer
Computers & industrial engineering 31 (1-2), 155-158, 1996
1001996
Designing parallel assembly lines
GA Süer
Computers & industrial engineering 35 (3-4), 467-470, 1998
971998
Design of dedicated, shared and remainder cells in a probabilistic demand environment
GA Süer, J Huang, S Maddisetty
International journal of production research 48 (19), 5613-5646, 2010
852010
Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells
GA Süer, RR Tummaluri
International Journal of Production Research 46 (2), 469-493, 2008
832008
Stochastic skill-based manpower allocation in a cellular manufacturing system
G Egilmez, B Erenay, GA Süer
Journal of Manufacturing Systems 33 (4), 578-588, 2014
822014
Optimal operator assignment and cell loading when lot-splitting is allowed
GA Süer, IS Bera
Computers & Industrial Engineering 35 (3-4), 431-434, 1998
801998
A dispatching rule-based genetic algorithm for multi-objective job shop scheduling using fuzzy satisfaction levels
J Huang, GA Süer
Computers & Industrial Engineering 86, 29-42, 2015
752015
Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells
GA Süer, C Dagli
Computers & Industrial Engineering 48 (3), 643-655, 2005
712005
Stochastic cellular manufacturing system design subject to maximum acceptable risk level
G Egilmez, GA Süer, J Huang
Computers & Industrial Engineering 63 (4), 842-854, 2012
702012
Stochastic mixed-model assembly line sequencing problem: Mathematical modeling and Q-learning based simulated annealing hyper-heuristics
H Mosadegh, SMTF Ghomi, GA Süer
European Journal of Operational Research 282 (2), 530-544, 2020
682020
Effects of Different Fuzzy Operators on Fuzzy Bi-objective Cell Loading Problem in Labor Intensive Manufacturing Cells
GA Suer, F Arikan, C Babayigit
Proceedings of the 35th International Conference on Computers and Industrial …, 2005
68*2005
Evaluation of manufacturing cell loading rules for independent cells
GA Suer, M Saiz, W Gonzalez
International Journal of Production Research 37 (15), 3445-3468, 1999
621999
Effective multiobjective EDA for bi-criteria stochastic job-shop scheduling problem
X Hao, M Gen, L Lin, GA Suer
Journal of intelligent Manufacturing 28, 833-845, 2017
562017
Minimizing the number of tardy jobs in identical machine scheduling
GA Süer, E Báez, Z Czajkiewicz
Computers & Industrial Engineering 25 (1-4), 243-246, 1993
541993
A hybrid method of 2-TSP and novel learning-based GA for job sequencing and tool switching problem
E Ahmadi, B Goldengorin, GA Süer, H Mosadegh
Applied Soft Computing 65, 214-229, 2018
502018
Models for cell loading and product sequencing in labor-intensive cells
GA Süer, J Cosner, A Patten
Computers & Industrial Engineering 56 (1), 97-105, 2009
502009
Manufacturing cell loading rules and algorithms for connected cells
GA Süer, M Saiz, C Dagli, W Gonzalez
Manufacturing Research and Technology 24, 97-127, 1995
461995
Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells
GA Süer, F Arikan, C Babayiğit
International Journal of Production Research 46 (2), 371-404, 2008
422008
Comparison of layered cellular manufacturing system design approaches
B Erenay, GA Suer, J Huang, S Maddisetty
Computers & Industrial Engineering 85, 346-358, 2015
412015
Sistem, işlemi şu anda gerçekleştiremiyor. Daha sonra yeniden deneyin.
Makaleler 1–20