Follow
TARIK ÇAKAR
Title
Cited by
Cited by
Year
A study of neural network based inverse kinematics solution for a three-joint robot
R Köker, C Öz, T Çakar, H Ekiz
Robotics and autonomous systems 49 (3-4), 227-234, 2004
1972004
A neural-network committee machine approach to the inverse kinematics problem solution of robotic manipulators
R Köker, T Çakar, Y Sari
Engineering with Computers 30 (4), 641-649, 2014
552014
Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks
MB Yildirim, T Cakar, U Doguc, JC Meza
Computers & Industrial Engineering 50 (1-2), 185-194, 2006
472006
Artificial neural networks for design of manufacturing systems and selection of priority rules
T Çakar, I Cil
International Journal of Computer Integrated Manufacturing 17 (3), 195-211, 2004
332004
Parallel robot scheduling to minimize mean tardiness with precedence constraints using a genetic algorithm
T Çakar, R Köker, Hİ Demir
Advances in Engineering Software 39 (1), 47-54, 2008
312008
A neuro-genetic-simulated annealing approach to the inverse kinematics solution of robots: a simulation based study
R Köker, T Çakar
Engineering with Computers 32 (4), 553-565, 2016
292016
A neuro-genetic approach to design and planning of a manufacturing cell
T Cakar, MB Yildirim, M Barut
Journal of Intelligent Manufacturing 16 (4), 453-462, 2005
242005
Integrated process planning, scheduling and due-date assignment
HI Demir, H Taskin, T Cakar
Sakarya Üniversitesi, Sakarya, Turkey, 2005
212005
Supplier selection process in dairy industry using fuzzy TOPSIS method
T Cakar, B Çavuş
Operational Research in Engineering Sciences: Theory and Applications 4 (1 …, 2021
142021
Green supplier selection using fuzzy multiple-criteria decision-making methods and artificial neural networks
T Gegovska, R Koker, T Cakar
Computational Intelligence and Neuroscience 2020, 2020
142020
Parallel robot scheduling to minimize mean tardiness with unequal release date and precedence constraints using a hybrid intelligent system
T Çakar, R Köker, Y Sarı
International Journal of Advanced Robotic Systems 9 (6), 252, 2012
122012
Kalite yönetim sistemleri
T Çakar, M Serdar
Sakarya University Journal of Science 6 (2), 87-91, 2002
102002
Process Planning and Due-date Assignment with ATC Dispatching where Earliness, Tardiness and Due-dates are Punished
HI Demir, T Cakar, M Ipek, O Uygun, M Sari
J. Ind. Intell. Inf. Vol 3 (3), 2015
82015
Solving single machine total weighted tardiness problem with unequal release date using neurohybrid particle swarm optimization approach
T Cakar, R Koker
Computational intelligence and neuroscience 2015, 2015
82015
İmalat sistemlerinin tasarlanmasında yapay sinirsel ağların kullanılması
T Çakar, AK Türker, A Toraman
ZİS 96, 75-84, 1996
71996
A new neuro-dominance rule for single-machine tardiness problem with double due date
T Cakar, R Köker, O Canay
Neural Computing and Applications 26 (6), 1439-1450, 2015
62015
Single machine scheduling with unequal release date using neuro-dominance rule
T Çakar
Journal of Intelligent Manufacturing 22 (4), 481-490, 2011
62011
Parallel robot manipulators, new developments
T Çakar, HR Yazgan, R Köker
Parallel robot scheduling with genetic algorithms, 153-170, 2008
52008
A new neuro-dominance rule for single machine tardiness problem
T Çakar
International Conference on Computational Science and Its Applications, 1241 …, 2005
42005
Otomotiv endüstrisinde yapay sinir ağı kullanarak maliyet tahmin modeli geliştirme
T CAKAR
Karaelmas Fen ve Mühendislik Dergisi 7 (1), 237-249, 2017
32017
The system can't perform the operation now. Try again later.
Articles 1–20