A study of neural network based inverse kinematics solution for a three-joint robot R Köker, C Öz, T Çakar, H Ekiz Robotics and autonomous systems 49 (3-4), 227-234, 2004 | 197 | 2004 |
A neural-network committee machine approach to the inverse kinematics problem solution of robotic manipulators R Köker, T Çakar, Y Sari Engineering with Computers 30 (4), 641-649, 2014 | 55 | 2014 |
Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks MB Yildirim, T Cakar, U Doguc, JC Meza Computers & Industrial Engineering 50 (1-2), 185-194, 2006 | 47 | 2006 |
Artificial neural networks for design of manufacturing systems and selection of priority rules T Çakar, I Cil International Journal of Computer Integrated Manufacturing 17 (3), 195-211, 2004 | 33 | 2004 |
Parallel robot scheduling to minimize mean tardiness with precedence constraints using a genetic algorithm T Çakar, R Köker, Hİ Demir Advances in Engineering Software 39 (1), 47-54, 2008 | 31 | 2008 |
A neuro-genetic-simulated annealing approach to the inverse kinematics solution of robots: a simulation based study R Köker, T Çakar Engineering with Computers 32 (4), 553-565, 2016 | 29 | 2016 |
A neuro-genetic approach to design and planning of a manufacturing cell T Cakar, MB Yildirim, M Barut Journal of Intelligent Manufacturing 16 (4), 453-462, 2005 | 24 | 2005 |
Integrated process planning, scheduling and due-date assignment HI Demir, H Taskin, T Cakar Sakarya Üniversitesi, Sakarya, Turkey, 2005 | 21 | 2005 |
Supplier selection process in dairy industry using fuzzy TOPSIS method T Cakar, B Çavuş Operational Research in Engineering Sciences: Theory and Applications 4 (1 …, 2021 | 14 | 2021 |
Green supplier selection using fuzzy multiple-criteria decision-making methods and artificial neural networks T Gegovska, R Koker, T Cakar Computational Intelligence and Neuroscience 2020, 2020 | 14 | 2020 |
Parallel robot scheduling to minimize mean tardiness with unequal release date and precedence constraints using a hybrid intelligent system T Çakar, R Köker, Y Sarı International Journal of Advanced Robotic Systems 9 (6), 252, 2012 | 12 | 2012 |
Kalite yönetim sistemleri T Çakar, M Serdar Sakarya University Journal of Science 6 (2), 87-91, 2002 | 10 | 2002 |
Process Planning and Due-date Assignment with ATC Dispatching where Earliness, Tardiness and Due-dates are Punished HI Demir, T Cakar, M Ipek, O Uygun, M Sari J. Ind. Intell. Inf. Vol 3 (3), 2015 | 8 | 2015 |
Solving single machine total weighted tardiness problem with unequal release date using neurohybrid particle swarm optimization approach T Cakar, R Koker Computational intelligence and neuroscience 2015, 2015 | 8 | 2015 |
İmalat sistemlerinin tasarlanmasında yapay sinirsel ağların kullanılması T Çakar, AK Türker, A Toraman ZİS 96, 75-84, 1996 | 7 | 1996 |
A new neuro-dominance rule for single-machine tardiness problem with double due date T Cakar, R Köker, O Canay Neural Computing and Applications 26 (6), 1439-1450, 2015 | 6 | 2015 |
Single machine scheduling with unequal release date using neuro-dominance rule T Çakar Journal of Intelligent Manufacturing 22 (4), 481-490, 2011 | 6 | 2011 |
Parallel robot manipulators, new developments T Çakar, HR Yazgan, R Köker Parallel robot scheduling with genetic algorithms, 153-170, 2008 | 5 | 2008 |
A new neuro-dominance rule for single machine tardiness problem T Çakar International Conference on Computational Science and Its Applications, 1241 …, 2005 | 4 | 2005 |
Otomotiv endüstrisinde yapay sinir ağı kullanarak maliyet tahmin modeli geliştirme T CAKAR Karaelmas Fen ve Mühendislik Dergisi 7 (1), 237-249, 2017 | 3 | 2017 |