Managing inventory and supply performance in assembly systems with random supply capacity and demand R Bollapragada, US Rao, J Zhang Management Science 50 (12), 1729-1743, 2004 | 119 | 2004 |
Managing two-stage serial inventory systems under demand and supply uncertainty and customer service level requirements R Bollapragada, US Rao, J Zhang IIE transactions 36 (1), 73-85, 2004 | 66 | 2004 |
Replenishment planning in discrete-time, capacitated, non-stationary, stochastic inventory systems R Bollapragada, US Rao IIE Transactions 38 (7), 605-617, 2006 | 47 | 2006 |
Method and apparatus for analyzing and designing various network configuration scenarios MI Abed, R Bollapragada, TB Morawski, LE Pinzon, SH Richman, ... US Patent 6,917,816, 2005 | 35 | 2005 |
Single-stage resource allocation and economic lot scheduling on multiple, nonidentical production lines R Bollapragada, U Rao Management Science 45 (6), 889-904, 1999 | 29 | 1999 |
Component procurement and end product assembly in an uncertain supply and demand environment R Bollapragada, S Kuppusamy, US Rao International Journal of Production Research 53 (3), 969-982, 2015 | 25 | 2015 |
Method and apparatus for designing various network configuration scenarios MI Abed, R Bollapragada, TB Morawski, LE Pinzon, SH Richman, ... US Patent 7,680,495, 2010 | 24 | 2010 |
Role of random capacity risk and the retailer in decentralized supply chains with competing suppliers F Qin, US Rao, H Gurnani, R Bollapragada Decision Sciences 45 (2), 255-279, 2014 | 23 | 2014 |
A two-phase greedy algorithm to locate and allocate hubs for fixed-wireless broadband access R Bollapragada, J Camm, US Rao, J Wu Operations research letters 33 (2), 134-142, 2005 | 21 | 2005 |
Budget-constrained, capacitated hub location to maximize expected demand coverage in fixed-wireless telecommunication networks R Bollapragada, Y Li, US Rao INFORMS Journal on Computing 18 (4), 422-432, 2006 | 19 | 2006 |
Inventory allocation models for a two-stage, two-product, capacitated supplier and retailer problem with random demand K Luo, R Bollapragada, L Kerbache International Journal of Production Economics 187, 168-181, 2017 | 16 | 2017 |
Constraint-based local search for inventory control under stochastic demand and lead time R Rossi, SA Tarim, R Bollapragada INFORMS journal on computing 24 (1), 66-80, 2012 | 16 | 2012 |
Forecasting the price of crude oil R Bollapragada, A Mankude, V Udayabhanu Decision 48 (2), 207-231, 2021 | 13 | 2021 |
Discrete-time, economic lot scheduling problem on multiple, non-identical production lines R Bollapragada, F Della Croce, M Ghirardi European journal of operational research 215 (1), 89-96, 2011 | 13 | 2011 |
Proactive release procedures for just‐in‐time job shop environments, subject to machine failures R Bollapragada, NM Sadeh Naval Research Logistics (NRL) 51 (7), 1018-1044, 2004 | 13 | 2004 |
Inventory requirements planning at lucent technologies A Bangash, R Bollapragada, R Klein, N Raman, HB Shulman, DR Smith Interfaces 34 (5), 342-352, 2004 | 12 | 2004 |
A decomposition approach for managing assembly systems with demand and supply uncertainty R Bollapragada, US Rao, J Zhang Working paper, Carnegie Mellon University, Pittsburgh, PA, 2000 | 11 | 2000 |
PRICE FORECASTING AND ANALYSIS OF EXCHANGE TRADED FUNDS. R Bollapragada, I Savin, L Kerbache International Journal of Finance 21 (1), 2009 | 10 | 2009 |
Price forecasting and analysis of exchange traded fund R Bollapragada, I Savin, L Kerbache Scientific Research Publishing, 2013 | 9 | 2013 |
Slow progress of fastrak: usage analysis of an electronic toll collection system H Bedolla, S Sengupta, R Bollapragada Transportation journal 46 (1), 51-61, 2007 | 9 | 2007 |