Takip et
Ömer Faruk Yılmaz
Başlık
Alıntı yapanlar
Alıntı yapanlar
Yıl
Operational strategies for seru production system: a bi-objective optimisation model and solution methods
ÖF Yılmaz
International Journal of Production Research 58 (11), 3195-3219, 2020
632020
Robust optimisation for ripple effect on reverse supply chain: an industrial case study
G Özçelik, ÖF Yılmaz, F Betül Yeni
International Journal of Production Research, 1-20, 2020
562020
Ensuring sustainability in the reverse supply chain in case of the ripple effect: A two-stage stochastic optimization model
ÖF Yılmaz, G Özçelik, FB Yeni
Journal of Cleaner Production, 2020
552020
Examining additive manufacturing in supply chain context through an optimization model
ÖF Yılmaz
Computers & Industrial Engineering 142, 106335, 2020
522020
Attaining flexibility in seru production system by means of Shojinka: An optimization model and solution approaches
ÖF Yılmaz
Computers & Operations Research 119, 104917, 2020
472020
Determination of material handling equipment for lean in-plant logistics using fuzzy analytical network process considering risk attitudes of the experts
ÖF Yılmaz, B Öztayşi, MB Durmuşoğlu, SC Öner
International Journal of Industrial Engineering: Theory, Applications and …, 2017
382017
Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches
ÖF Yılmaz, B Yazıcı
Annals of Operations Research, 2021
302021
Minimizing average lead time for the coordinated scheduling problem in a two-stage supply chain with multiple customers and multiple manufacturers
ÖF Yılmaz, PM Pardalos
Computers & Industrial Engineering 114, 244-257, 2017
302017
A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment
ÖF Yılmaz, MB Durmuşoğlu
Journal of Industrial & Management Optimization 14 (3), 1219-1249, 2018
272018
Lot streaming in hybrid flowshop scheduling problem by considering equal and consistent sublots under machine capability and limited waiting time constraint
BG Yılmaz, ÖF Yılmaz
Computers&Industrial Engineering, 2022
242022
Lean holistic fuzzy methodology employing cross-functional worker teams for new product development projects: A real case study from high-tech industry
ÖF Yılmaz, G Özçelik, FB Yeni
European Journal of Operational Research 282 (3), 989-1010, 2020
242020
Scheduling batches in multi hybrid cell manufacturing system considering worker resources: A case study from pipeline industry
ÖF Yılmaz, E Çevikcan, MB Durmuşoğlu
Advances in Production Engineering & Management 11 (3), 192-206, 2016
222016
An integrated bi-objective U-shaped assembly line balancing and parts feeding problem: optimization model and exact solution method
ÖF Yılmaz
Annals of Mathematics and Artificial Intelligence, 2020
142020
Multi-objective scheduling problem for hybrid manufacturing systems with walking workers
ÖF Yılmaz, MB Durmuşoğlu
International Journal of Industrial Engineering: Theory, Applications and …, 2019
132019
Evolutionary algorithms for multi-objective scheduling in a hybrid manufacturing system
ÖF Yılmaz, MB Durmuşoğlu
Handbook of research on applied optimization methodologies in manufacturing …, 2018
102018
Robust optimization for U-shaped assembly line worker assignment and balancing problem with uncertain task times
ÖF Yılmaz
Croatian Operational Research Review, 229-239, 2020
82020
An optimization-based methodology equipped with lean tools to strengthen medical supply chain resilience during a pandemic: A case study from Turkey
ÖF Yılmaz, FB Yeni, B Gürsoy Yılmaz, G Özçelik
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2023
72023
Bekleyen sipariş durumunda sürekli gözden geçirmeye dayalı olasılıklı (R,Q) stok kontrol modeli ve depo yapısı
ÖF Yılmaz
İTÜ Fen Bilimleri Enstitüsü, 2012
72012
Assembly line balancing by using axiomatic design principles: An application from cooler manufacturing industry
ÖF Yılmaz, ÖF Demirel, S Zaim, Ş Sevim
International Journal of Production Management and Engineering 8 (1), 31-43, 2020
62020
Lot streaming in workforce scheduling problem for seru production system under Shojinka philosophy
B Gürsoy Yılmaz, ÖF Yılmaz, E Çevikcan
Computers&Industrial Engineering, 2023
52023
Sistem, işlemi şu anda gerçekleştiremiyor. Daha sonra yeniden deneyin.
Makaleler 1–20