Follow
Joseph Handibry Mbatu Tah
Joseph Handibry Mbatu Tah
Pro Vice-Chancellor/Dean and Professor of Project Management, Oxford Brookes
Verified email at brookes.ac.uk - Homepage
Title
Cited by
Cited by
Year
A proposal for construction project risk assessment using fuzzy logic
JHM Tah, V Carr
Construction Management & Economics 18 (4), 491-500, 2000
6192000
A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
V Carr, JHM Tah
Advances in engineering software 32 (10-11), 847-857, 2001
5152001
Knowledge-based approach to construction project risk management
JHM Tah, V Carr
Journal of computing in civil engineering 15, 170, 2001
2932001
Towards a framework for project risk knowledge management in the construction supply chain
JHM Tah, V Carr
Advances in Engineering software 32 (10-11), 835-846, 2001
2762001
BIM in off-site manufacturing for buildings
FH Abanda, JHM Tah, FKT Cheung
Journal of building engineering 14, 89-102, 2017
2532017
Early stage multi-level cost estimation for schematic BIM models
FKT Cheung, J Rihan, J Tah, D Duce, E Kurul
Automation in construction 27, 67-77, 2012
2452012
A critical analysis of Building Information Modelling systems used in construction projects
FH Abanda, C Vidalakis, AH Oti, JHM Tah
Advances in Engineering Software 90, 183-201, 2015
2422015
Deep learning for detecting building defects using convolutional neural networks
H Perez, JHM Tah, A Mosavi
Sensors 19 (16), 3556, 2019
2272019
Learning from risks: A tool for post-project risk assessment
I Dikmen, MT Birgonul, C Anac, JHM Tah, G Aouad
Automation in Construction 18 (1), 42-50, 2008
2122008
Contractor project risks contingency allocation using linguistic approximation
JHM Tah, A Thorpe, R McCaffer
Computing systems in engineering 4 (2-3), 281-293, 1993
1661993
A framework for the utilization of Building Management System data in building information models for building design and operation
AH Oti, E Kurul, F Cheung, JHM Tah
Automation in Construction 72, 195-210, 2016
1592016
BIM–New rules of measurement ontology for construction cost estimation
FH Abanda, B Kamsu-Foguem, JHM Tah
Engineering Science and Technology, an International Journal 20 (2), 443-459, 2017
1422017
Prediction of compression index of fine-grained soils using a gene expression programming model
D Mohammadzadeh S, SF Kazemi, A Mosavi, E Nasseralshariati, ...
Infrastructures 4 (2), 26, 2019
1372019
Prediction of multi-inputs bubble column reactor using a novel hybrid model of computational fluid dynamics and machine learning
A Mosavi, S Shamshirband, E Salwana, K Chau, JHM Tah
Engineering Applications of Computational Fluid Mechanics 13 (1), 482-492, 2019
1352019
Information modelling for a construction project risk management system
JHM Tah, V Carr
Engineering, Construction and Architectural Management 7 (2), 107-119, 2000
1322000
RFID-facilitated construction materials management (RFID-CMM)–A case study of water-supply project
Z Ren, CJ Anumba, J Tah
Advanced Engineering Informatics 25 (2), 198-207, 2011
1212011
Mathematical modelling of embodied energy, greenhouse gases, waste, time–cost parameters of building projects: A review
FH Abanda, JHM Tah, FKT Cheung
Building and environment 59, 23-37, 2013
1192013
Genetic algorithms application and testing for equipment selection
A Haidar, S Naoum, R Howes, J Tah
Journal of construction engineering and management 125, 32, 1999
1181999
Trends in built environment semantic Web applications: Where are we today?
FH Abanda, JHM Tah, R Keivani
Expert Systems with Applications 40 (14), 5563-5577, 2013
1172013
Structural sustainability appraisal in BIM
AH Oti, W Tizani, FH Abanda, A Jaly-Zada, JHM Tah
Automation in Construction 69, 44-58, 2016
1062016
The system can't perform the operation now. Try again later.
Articles 1–20