Takip et
Faicel HNAIEN
Faicel HNAIEN
Associate Professor, list3n, université de Technologie de Troyes
utt.fr üzerinde doğrulanmış e-posta adresine sahip - Ana Sayfa
Başlık
Alıntı yapanlar
Alıntı yapanlar
Yıl
Handling uncertainty in agricultural supply chain management: A state of the art
V Borodin, J Bourtembourg, F Hnaien, N Labadie
European Journal of Operational Research 254 (2), 348-359, 2016
2822016
Sensor deployment optimization methods to achieve both coverage and connectivity in wireless sensor networks
M Rebai, H Snoussi, F Hnaien, L Khoukhi
Computers & Operations Research 59, 11-21, 2015
1862015
A state of the art on supply planning and inventory control under lead time uncertainty
A Dolgui, OB Ammar, F Hnaien, MA Louly
Studies in Informatics and Control 22 (3), 255-268, 2013
892013
Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
F Hnaien, X Delorme, A Dolgui
Computers & operations research 37 (11), 1835-1843, 2010
862010
Optimal supply planning in MRP environments for assembly systems with random component procurement times
MA Louly, A Dolgui, F Hnaien
International Journal of Production Research 46 (19), 5441-5467, 2008
832008
Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint
MA Louly, A Dolgui, F Hnaien
International Journal of Production Economics 115 (1), 236-247, 2008
832008
Genetic algorithm for supply planning in two-level assembly systems with random lead times
F Hnaien, X Delorme, A Dolgui
Engineering Applications of Artificial Intelligence 22 (6), 906-915, 2009
612009
Estimation of global solar radiation using three simple methods
ABEN Jemaa, S Rafa, N Essounbouli, A Hamzaoui, F Hnaien, F Yalaoui
Energy Procedia 42, 406-415, 2013
572013
Electricity cost minimisation for optimal makespan solution in flow shop scheduling under time-of-use tariffs
MH Ho, F Hnaien, F Dugardin
International journal of production research 59 (4), 1041-1067, 2021
462021
Multi-objective optimization in wireless sensors networks
M Le Berre, F Hnaien, H Snoussi
ICM 2011 Proceeding, 1-4, 2011
432011
Single-period inventory model for one-level assembly system with stochastic lead times and demand
F Hnaien, A Dolgui, DD Wu
International Journal of Production Research 54 (1), 186-203, 2016
372016
Makespan minimization on a two-machine flowshop with an availability constraint on the first machine
F Hnaien, F Yalaoui, A Mhadhbi
International Journal of Production Economics 164, 95-104, 2015
372015
Planned lead time optimization in material requirement planning environment for multilevel production systems
F Hnaien, A Dolgui, MA Ould Louly
Journal of Systems Science and Systems Engineering 17, 132-155, 2008
362008
A quality risk management problem: case of annual crop harvest scheduling
V Borodin, J Bourtembourg, F Hnaien, N Labadie
International Journal of Production Research 52 (9), 2682-2695, 2014
342014
Robust single-item lot-sizing problems with discrete-scenario lead time
F Hnaien, HM Afsar
International Journal of Production Economics 185, 223-229, 2017
302017
Optimal placement in hybrid VANETs-sensors networks
M Rebai, L Khoukhi, H Snoussi, F Hnaien
2012 Wireless Advanced (WiAd), 54-57, 2012
302012
A mixed-integer programming model for integrated production and maintenance
F Hnaien, F Yalaoui, A Mhadhbi, M Nourelfath
IFAC-PapersOnLine 49 (12), 556-561, 2016
272016
Component replenishment planning for a single-level assembly system under random lead times: A chance constrained programming approach
V Borodin, A Dolgui, F Hnaien, N Labadie
International Journal of Production Economics 181, 79-86, 2016
262016
COTS software integration for simulation optimization coupling: case of ARENA and CPLEX products
V Borodin, J Bourtembourg, F Hnaien, N Labadie
International Journal of Modelling and Simulation 39 (3), 178-189, 2019
222019
Two-machine job shop problem under availability constraints on one machine: Makespan minimization
M Benttaleb, F Hnaien, F Yalaoui
Computers & Industrial Engineering 117, 138-151, 2018
222018
Sistem, işlemi şu anda gerçekleştiremiyor. Daha sonra yeniden deneyin.
Makaleler 1–20