Mehmet Bayram Yildirim
Mehmet Bayram Yildirim
Professor of Industrial and Manufacturing Engineering, Wichita State University
wichita.edu üzerinde doğrulanmış e-posta adresine sahip - Ana Sayfa
Başlık
Alıntı yapanlar
Alıntı yapanlar
Yıl
Operational methods for minimization of energy consumption of manufacturing equipment
G Mouzon, MB Yildirim, J Twomey
International Journal of production research 45 (18-19), 4247-4271, 2007
4442007
A framework to minimise total energy consumption and total tardiness on a single machine
G Mouzon, MB Yildirim
International Journal of Sustainable Engineering 1 (2), 105-116, 2008
2552008
A model for the multiperiod multiobjective power generation expansion problem
JLC Meza, MB Yildirim, ASM Masud
IEEE Transactions on Power Systems 22 (2), 871-878, 2007
2062007
Single-machine sustainable production planning to minimize total energy consumption and total completion time using a multiple objective genetic algorithm
MB Yildirim, G Mouzon
IEEE transactions on engineering management 59 (4), 585-597, 2011
1342011
A toll pricing framework for traffic assignment problems with elastic demand
DW Hearn, MB Yildirim
Transportation and network analysis: Current trends, 135-145, 2002
1192002
A first best toll pricing framework for variable demand traffic assignment problems
MB Yildirim, DW Hearn
Transportation Research Part B: Methodological 39 (8), 659-678, 2005
1182005
A multiobjective evolutionary programming algorithm and its applications to power generation expansion planning
JLC Meza, MB Yildirim, ASM Masud
IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and …, 2009
862009
Data collection framework on energy consumption in manufacturing
R Drake, MB Yildirim, JM Twomey, LE Whitman, JS Ahmad, P Lodhia
842006
An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times
T Keskinturk, MB Yildirim, M Barut
Computers & Operations Research 39 (6), 1225-1235, 2012
752012
A new lower bounding scheme for the total weighted tardiness problem
MS Akturk, MB Yildirim
Computers & operations research 25 (4), 265-278, 1998
571998
Operations research methodologies
AR Ravindran
Crc Press, 2008
532008
Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks
MB Yildirim, T Cakar, U Doguc, JC Meza
Computers & Industrial Engineering 50 (1-2), 185-194, 2006
452006
A sustainability approach for selecting maintenance strategy
FG Nezami, MB Yildirim
International Journal of Sustainable Engineering 6 (4), 332-343, 2013
432013
Predicting graft survival among kidney transplant recipients: A Bayesian decision support model
K Topuz, FD Zengul, A Dag, A Almehmi, MB Yildirim
Decision Support Systems 106, 97-109, 2018
352018
A new dominance rule for the total weighted tardiness problem
MS Akturk, MB Yildirim
Production Planning & Control 10 (2), 138-149, 1999
321999
Integrated maintenance and production planning with energy consumption and minimal repair
MB Yildirim, FG Nezami
The International Journal of Advanced Manufacturing Technology 74 (9-12 …, 2014
282014
Acoustical properties of electrospun fibers for aircraft interior noise reduction
WS Khan, R Asmatulu, MB Yildirim
Journal of Aerospace Engineering 25 (3), 376-382, 2012
282012
Congestion toll pricing models and methods for variable demand networks
MB Yildirim
University of Florida, 2001
262001
Acoustical properties of electrospun nanofibers for aircraft interior noise reduction
R Asmatulu, W Khan, MB Yildirim
ASME International Mechanical Engineering Congress and Exposition 43888, 223-227, 2009
252009
A neuro-genetic approach to design and planning of a manufacturing cell
T Cakar, MB Yildirim, M Barut
Journal of Intelligent Manufacturing 16 (4-5), 453-462, 2005
222005
Sistem, işlemi şu anda gerçekleştiremiyor. Daha sonra yeniden deneyin.
Makaleler 1–20