Follow
Beyza Taskin
Beyza Taskin
Verified email at itu.edu.tr - Homepage
Title
Cited by
Cited by
Year
Failures of masonry and concrete buildings during the March 8, 2010 Kovancılar and Palu (Elazığ) earthquakes in Turkey
Z Celep, A Erken, B Taskin, A Ilki
Engineering Failure Analysis 18 (3), 868-889, 2011
1272011
Transient Analysis of Dam-Reservoir Interaction Including the Reservoir Bottom Effects
S Kucukarslan, SB Coskun, B Taskin
Journal of Fluids and Structures 20 (8), 1073-1084, 2005
742005
The aftermath of 2011 Van earthquakes: evaluation of strong motion, geotechnical and structural issues
B Taskin, A Sezen, UM Tugsal, A Erken
Bulletin of Earthquake Engineering 11, 285-312, 2013
512013
Numerical simulation of RC infill walls under cyclic loading and calibration with widely used hysteretic models and experiments
O Görgülü, B Taskin
Bulletin of Earthquake Engineering 13, 2591-2610, 2015
172015
Seismic safety screening method for Istanbul Metropolitan City
R Ozdemir, B Taskin
Proceedings of 10th East Asia Pacific conference on structural engineering …, 2006
142006
A Novel Post-Earthquake Damage Survey Sheet: Part I-RC Buildings
B Taskin, K Guler, UM Tugsal, M Gencoglu, M Celik, Z Hasgur, ...
15WCEE, 2012
62012
Bending Behavior of Steel-Fiber Reinforced Concrete
M Gencoglu, M Komur, B Taskin
Proceedings of the 4th GAP Engineering Congress, 2002
62002
Analytical investigation of the observed damage in an RC building after March 08, 2010 Kovancilar-Turkey earthquake
B Taskin, UM Tugsal
Bulletin of Earthquake Engineering 9, 1047-1065, 2011
52011
Monte Carlo analysis of earthquake resistant RC 3D shear wall-frame structures
B Taskin, Z Hasgur
Structural engineering and mechanics: An international journal 22 (3), 371-399, 2006
52006
November 12, 1999 Düzce earthquake: a reconnaissance report for the town of Kaynasli
P Ozdemir, B Taskin, C Vatansever, A Sezen, A Ilki, H Boduroglu
12th Proc. European Conference of Earthquake Engineering, 2002
52002
Investigation of infill wall effect for the seismic performance of a moderately damaged RC Building
B Taskin, Z Hasgür
Proc. 14 WCEE, Beijing, 12-17, 2008
42008
Performance evaluation of a vertically irregular RC building
K Güler, MG Güler, B Taskin, M Altan
The 14th World Conference on Earthquake Engineering, Beijing, China, 2008
42008
An experimental study of a midbroken 2-bay, 6-storey reinforced concrete frame subject to earthquakes
PS Skjærbæk, B Taşkin, PH Kirkegaard, SRK Nielsen
Soil Dynamics and Earthquake Engineering 16 (6), 373-384, 1997
41997
Investigation of ductility reduction factor in seismic rehabilitation of existing reinforced concrete school buildings
O Gorgulu, B Taskin
Research Journal of Applied Sciences, Engineering and Technology 9 (4), 231-238, 2015
22015
Analysis of seismic behavior of a building from Turkey using real earthquake records
UM Tugsal, S Baykut, B Taskin, T Akgul
2011 19th European Signal Processing Conference, 899-902, 2011
22011
An Experimental Study of a Midbroken 2-Bay, 6-Story Reinforced Croncrete Frame subjekt to Earthquakes
PS Skjærbæk, B Taskin, SRK Nielsen, PH Kirkegaard
Dept. of Building Technology and Structural Engineering, Aalborg University, 1997
21997
Critical evaluation of NDT for rapid condition assessment of existing RC buildings: A case study
S Karatosun, M Yazar, O Gunes, B Taskin
MATEC Web of Conferences 361, 07001, 2022
12022
A Multi-mode Pushover Analysis Procedure to Estimate the Seismic Demands of Mediumrise Unsymmetric-plan Buildings
FI Kara, Y Fahjan, B Taskin
Research Journal of Applied Sciences, Engineering and Technology 13 (2), 131-142, 2016
12016
Seismic performance evaluation of school buildings subjected to 2011 Van earthquakes
B Taskin, UM Tugsal
12014
A computationally efficient solution of the wave equation for the transient response of infinite reservoirs
B Taskin, S Kucukarslan
Archive of Applied Mechanics 75, 68-77, 2005
12005
The system can't perform the operation now. Try again later.
Articles 1–20