Takip et
M. Prins
M. Prins
former associate professor Design and construction management Delft University of Technology, CIB
ziggo.nl üzerinde doğrulanmış e-posta adresine sahip
Başlık
Alıntı yapanlar
Alıntı yapanlar
Yıl
Challenges for integrated design and delivery solutions
R Owen, R Amor, M Palmer, J Dickinson, CB Tatum, AS Kazi, M Prins, ...
Architectural Engineering and Design Management 6 (4), 232-240, 2010
1662010
Integrated Design & Delivery Solutions
R Owen, M Palmer, J Dickinson, B Tatum, AS Kazi, R Amor, M Prins
CIB White Paper on IDDS, CIB Publication 328, 2009
151*2009
Conceptual framework for potential implementations of multi criteria decision making (MCDM) methods for design quality assessment
T Harputlugil, M Prins, AT Gültekin, YI Topçu
Management and Innovation for a Sustainable Built Environment MISBE 2011 …, 2011
882011
Design Management Within the Digital Design Team
A Otter, M Prins
ECAM, july, 162-173, 2002
59*2002
Architectural management: international research and practice
S Emmitt, M Prins, A den Otter
John Wiley & Sons, 2009
532009
Architectural design quality assessment based on analytic hierarchy process: A case study
T Harputlugil, AT Gültekin, M Prins, Yİ Topçu
METU Journal of the Faculty of Architecture 31 (2), 2016
422016
Circular economy and real estate: the legal (im) possibilities of operational lease
H Ploeger, M Prins, A Straub, R Van den Brink
Facilities 37 (9/10), 653-668, 2019
252019
Exploring the possibilities of correlating management with value in architectural design
L Volker, M Prins
'special meeting'on designing value: new directions in architectural …, 2005
222005
Façade leasing: drivers and barriers to the delivery of integrated façades-as-a-service
JA Aguerre, T Klein, A den Heijer, R Vrijhoef, H Ploeger, M Prins
Real Estate Research Quarterly 17 (3), 11-22, 2018
212018
Chapter One Architectural Value
M Prins
Architectural Management: International Research and Practice, 3, 2009
21*2009
Radical circular economy
M Prins, S Mohammadi, N Slob
Proceedings of the CIB joint international symposium-Going north for …, 2015
162015
Collaborative architectural design management
R Sebastian, M Prins
Architectural Management, 2009
152009
BIM at small architectural firms
B Leeuwis, M Prins, A Pastoors
19th CIB World Building Congress-Construction and Society, 2013
142013
FLEX 3.0: an instrument to formulate the demand for and assessing the supply of the adaptive capacity of buildings
RP Geraedts, M Prins
CIB World Building Congress WBC2016. N. Achour. Tampere, Tampere University …, 2016
132016
Architectural management
S Emmitt, M Prins, AD OTTER
International Research and, 2009
122009
Semiotic based facetted classification to support browsing architectural contents in MACE
V Spigai, M Condotta, E Dalla Vecchia, T Nagel
Performance and Knowledge Management: proceedings of joint CIB Conference …, 2008
122008
The CE Meter: An instrument to assess the circular economy capacity of buildings
RP Geraedts, M Prins
Proceedings of the CIB joint international symposium-Going north for …, 2015
112015
Briefing: static or dynamic?
M Prins, J Koolwijk, L Volker, JMF Wamelink
Proceedings of the joint CIB, Tensinet, IASS International Conference on …, 2006
112006
Fast-tracking by high perfomance Design Teams
F Otter, M Prins
Perfomance in Product and Practice (CD-rom), # 1-# 12, 2001
112001
Flexibiliteit en kosten in het ontwerpproces: een besluitvormingondersteunend model
M Prins
111992
Sistem, işlemi şu anda gerçekleştiremiyor. Daha sonra yeniden deneyin.
Makaleler 1–20