Follow
Daniel Mora
Title
Cited by
Cited by
Year
Battle of the water networks II
A Marchi, E Salomons, A Ostfeld, Z Kapelan, AR Simpson, AC Zecchin, ...
Journal of water resources planning and management 140 (7), 04014009, 2014
1502014
The multiple team formation problem using sociometry
JH Gutiérrez, CA Astudillo, P Ballesteros-Pérez, D Mora-Melià, ...
Computers & Operations Research 75, 150-162, 2016
1032016
Development of sustainable fired clay bricks by adding kindling from vine shoot: Study of thermal and mechanical properties
PM Velasco, MPM Ortiz, MAM Giró, DM Melia, JH Rehbein
Applied Clay Science 107, 156-164, 2015
842015
Efficiency of evolutionary algorithms in water network pipe sizing
D Mora-Meliá, PL Iglesias-Rey, FJ Martínez-Solano, P Ballesteros-Perez
Water resources management 29, 4817-4831, 2015
642015
Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects
P Ballesteros-Pérez, E Sanz-Ablanedo, D Mora-Melia, MC González-Cruz, ...
Automation in Construction 103, 279-290, 2019
542019
Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims
P Ballesteros-Pérez, YA Rojas-Céspedes, W Hughes, S Kabiri, E Pellicer, ...
Automation in construction 84, 81-95, 2017
542017
Design of water distribution networks using a pseudo-genetic algorithm and sensitivity of genetic operators
D Mora-Melia, PL Iglesias-Rey, FJ Martinez-Solano, VS Fuertes-Miquel
Water resources management 27, 4149-4162, 2013
502013
Hydraulic modeling during filling and emptying processes in pressurized pipelines: A literature review
VS Fuertes-Miquel, OE Coronado-Hernández, D Mora-Meliá, ...
Urban Water Journal 16 (4), 299-311, 2019
472019
The efficiency of setting parameters in a modified shuffled frog leaping algorithm applied to optimizing water distribution networks
D Mora-Melia, PL Iglesias-Rey, FJ Martínez-Solano, P Muñoz-Velasco
Water 8 (5), 182, 2016
472016
Transient phenomena during the emptying process of a single pipe with water–air interaction
VS Fuertes-Miquel, OE Coronado-Hernández, PL Iglesias-Rey, ...
Journal of Hydraulic Research, 2018
452018
Multi-objective optimization for urban drainage or sewer networks rehabilitation through pipes substitution and storage tanks installation
UA Ngamalieu-Nengoue, FJ Martínez-Solano, PL Iglesias-Rey, ...
Water 11 (5), 935, 2019
392019
Viability of green roofs as a flood mitigation element in the central region of Chile
D Mora-Melià, CS López-Aburto, P Ballesteros-Pérez, P Muñoz-Velasco
Sustainability 10 (4), 1130, 2018
392018
Modeling bidding competitiveness and position performance in multi-attribute construction auctions
P Ballesteros-Pérez, ML del Campo-Hitschfeld, D Mora-Melià, ...
Operations Research Perspectives 2, 24-35, 2015
372015
Human resource allocation to multiple projects based on members’ expertise, group heterogeneity, and social cohesion
P Ballesteros-Pérez, FTT Phua, D Mora-Melià
Journal of Construction Engineering and Management 145 (2), 04018134, 2019
292019
Urban drainage network rehabilitation considering storm tank installation and pipe substitution
UA Ngamalieu-Nengoue, PL Iglesias-Rey, FJ Martínez-Solano, ...
Water 11 (3), 515, 2019
262019
Mechanical properties and seismic performance of wood-concrete composite blocks for building construction
D Dominguez-Santos, D Mora-Melia, G Pincheira-Orellana, ...
Materials 12 (9), 1500, 2019
252019
Population size influence on the efficiency of evolutionary algorithms to design water networks
D Mora-Melià, FJ Martínez-Solano, PL Iglesias-Rey, ...
Procedia Engineering 186, 341-348, 2017
242017
A methodology for the optimization of flow rate injection to looped water distribution networks through multiple pumping stations
C León-Celi, PL Iglesias-Rey, FJ Martínez-Solano, D Mora-Melia
Water 8 (12), 575, 2016
222016
Structural resistance of reinforced concrete buildings in areas of moderate seismicity and assessment of strategies for structural improvement
D Dominguez-Santos, P Ballesteros-Perez, D Mora-Melia
Buildings 7 (4), 89, 2017
202017
Stability and accuracy of deterministic project duration forecasting methods in earned value management
A Barrientos-Orellana, P Ballesteros-Pérez, D Mora-Melia, ...
Engineering, Construction and Architectural Management 29 (3), 1449-1469, 2022
192022
The system can't perform the operation now. Try again later.
Articles 1–20