Follow
Rico Gujjula
Rico Gujjula
Rumah Besi
Verified email at rumahbesi.com
Title
Cited by
Cited by
Year
Part feeding at high-variant mixed-model assembly lines
J Golz, R Gujjula, HO Günther, S Rinderer, M Ziegler
Flexible Services and Manufacturing Journal 24, 119-141, 2012
1432012
Master production scheduling and sequencing at mixed-model assembly lines in the automotive industry
J Dörmer, HO Günther, R Gujjula
Flexible Services and Manufacturing Journal 27, 1-29, 2015
542015
Strategies for improving a long-established terminal’s performance: a simulation study of a Turkish container terminal
O Kulak, O Polat, R Gujjula, HO Günther
Flexible Services and Manufacturing Journal 25, 503-527, 2013
422013
Resequencing mixed-model assembly lines under just-in-sequence constraints
R Gujjula, HO Gunther
2009 International Conference on Computers & Industrial Engineering, 668-673, 2009
262009
A heuristic based on Vogel's approximation method for sequencing mixed-model assembly lines
R Gujjula, S Werk, HO Günther
International Journal of Production Research 49 (21), 6451-6468, 2011
222011
Scheduling utility workers at mixed-model assembly lines
R Gujjula, HO Günther
2009 IEEE International Conference on Industrial Engineering and Engineering …, 2009
112009
Rescheduling blocked workpieces at mixed-model assembly lines with just-in-sequence supply
R Gujjula, HO Günther
Proceedings of Asia Pacific Industrial Engineering and Management Systems …, 2009
102009
The impact of storage block assignment for import containers on AGV dispatching in highly automated seaport container terminals
R Gujjula, HO Gunther
2008 IEEE International Conference on Industrial Engineering and Engineering …, 2008
82008
An efficient heuristic to sequence mixed-model assembly lines
R Gujjula, HO Günther
2010 IEEE International Conference on Industrial Engineering and Engineering …, 2010
72010
Integrated scheduling of equipment for quayside transport in automated seaport container terminals
R Gujjula, HO Günther
Transportation and Management, Science, 719-727, 2008
42008
Master production scheduling for high-variant mixed-model assembly lines
J Dörmer, HO Günther, R Gujjula, K Friedrich
2010 17th international annual EurOMA conference: managing operations in …, 2010
32010
Flexible Personaleinsatzplanung
R Gujjula, H Seidel, S Kabelitz, A Götze
Flexible Prozesse mitarbeiterfreundlich und energieeffizient gestalten …, 2014
22014
Einsatz von mathematischen Optimierungsverfahren zur energieorientierten Produktionsplanung
S Kabelitz, U Streckfuß, R Gujjula
TBI2014, 2014
12014
A novel heuristic for sequencing mixed-model assembly lines
R Gujjula, S Werk, HO Günther
Comput Integr Manuf Syst 15, 2350-2318, 2013
12013
Die Fabrik 4.0 planen. Projekt'Bau Zeit'
R Gujjula, A Götze, S Kabelitz, H Seidel
2016
Storage Block Assignment for Import Containers in Automated Seaport Container Terminals
R Gujjula, HO Günther
The system can't perform the operation now. Try again later.
Articles 1–16